| Neighborhood | Street | From Street | To Street | Estimated Start | Duration | Status |
| Allston/Brighton | BERTRAM ST | NORTH HARVARD ST | TRAVIS ST | TBD | 2 Weeks | |
| Allston/Brighton | BLENFORD RD | COLBORNE ST | DEAD END | TBD | 2 Weeks | |
| Allston/Brighton | BRAYTON RD | BRECK AV | NEWTON TOWN LINE | TBD | 2 Weeks | |
| Allston/Brighton | BROOKS ST | FANEUIL ST | NEWTON ST | TBD | 2 Weeks | |
| Allston/Brighton | CALTHA RD | UNDINE RD | DEAD END | TBD | 2 Weeks | |
| Allston/Brighton | CHISWICK RD | SELKIRK RD | SERVICE RD (COMM AV) | TBD | 2 Weeks | |
| Allston/Brighton | CUFFLIN ST | TREMONT ST | NONANTUM ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall 2011/ Final Paving scheduled for Spring 2012 |
| Allston/Brighton | DUNBOY ST | PERTHSHIRE RD | BIGELOW ST | TBD | 2 Weeks | |
| Allston/Brighton | DUNCKLEE ST | HARRIET ST | MADELINE ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Allston/Brighton | ELEANOR ST | RIDGEMONT ST | CAMBRIDGE ST | TBD | 2 Weeks | |
| Allston/Brighton | EMBASSY RD | CHESTNUT HILL AV | PORTINA RD | TBD | 2 Weeks | |
| Allston/Brighton | GERRISH ST | BROOKS ST | DEAD END | TBD | 2 Weeks | |
| Allston/Brighton | GLENMONT RD | WILLOUGHBY ST | FOSTER ST | TBD | 2 Weeks | |
| Allston/Brighton | GLENMONT RD | FOSTER ST | LAKE ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Allston/Brighton | GREYCLIFF RD | FOSTER ST | COMMONWEALTH AV | TBD | 2 Weeks | |
| Allston/Brighton | HARRIET ST | PARSONS ST | FANEUIL ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Allston/Brighton | HOOKER ST | NORTH HARVARD ST | DEAD END | TBD | 2 Weeks | |
| Allston/Brighton | HOOKER ST | ROYAL ST | NORTH HARVARD ST | TBD | 2 Weeks | |
| Allston/Brighton | KEENAN RD | MARKET ST | RYAN RD | TBD | 2 Weeks | |
| Allston/Brighton | KENRICK ST | LAKE SHORE RD | NEWTON TOWN LINE | TBD | 2 Weeks | |
| Allston/Brighton | KINGSLEY ST | NORTH HARVARD ST | TRAVIS ST | TBD | 2 Weeks | |
| Allston/Brighton | LITCHFIELD ST | HOLTON ST | WESTERN AV | TBD | 2 Weeks | |
| Allston/Brighton | MADELINE ST | HARRIET ST | FANEUIL ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Allston/Brighton | MALIA TER | BEACON ST | NEWTON TOWN LINE | TBD | 2 Weeks | |
| Allston/Brighton | NILES ST | PARSONS ST | DEAD END | TBD | 2 Weeks | |
| Allston/Brighton | NORTH HARVARD ST | WESTERN AV | CAMBRIDGE ST | APRIL | 2 Weeks | COMPLETED |
| Allston/Brighton | PARK VALE AV | GLENVILLE AV | BRIGHTON AV EB | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Allston/Brighton | PARSONS ST | WASHINGTON ST | SURREY ST | TBD | 2 Weeks | |
| Allston/Brighton | PRESENTATION RD | WASHINGTON ST | DEAD END | TBD | 2 Weeks | |
| Allston/Brighton | RIVERDALE ST | WESTERN AV | RAYMOND ST | TBD | 2 Weeks | |
| Allston/Brighton | RYAN RD | KEENAN RD | DEAD END | TBD | 2 Weeks | |
| Allston/Brighton | TIP TOP ST | WASHINGTON ST | TREMONT ST | TBD | 2 Weeks | |
| Allston/Brighton | TRAPELO ST | LAKE ST | WILLOUGHBY ST | TBD | 2 Weeks | |
| Allston/Brighton | TRAPELO ST | WILLOUGHBY ST | GLENMONT RD | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Allston/Brighton | UNDINE RD | LAKE ST | LAKE ST | TBD | 2 Weeks | |
| Allston/Brighton | UPCREST RD | BROOKS ST | DEAD END | TBD | 2 Weeks | |
| Allston/Brighton | WILLOUGHBY ST | GLENMONT RD | ROGERS PARK AV | TBD | 2 Weeks | |
| Back Bay | FAIRFIELD ST | NEWBURY ST | BOYLSTON ST | TBD | 2 Weeks | National Grid installed a new gas main in 2011 Delaying paving until 2012 |
| Back Bay | PUBLIC ALLEY 905 | MASSACHUSETTS AV | MARLBOROUGH ST | TBD | 2 Weeks | |
| Beacon Hill | ANDERSON ST | CAMBRIDGE ST | PINCKNEY ST | TBD | 2 Weeks | |
| Beacon Hill | DERNE ST | BOWDOIN ST | MYRTLE ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Beacon Hill | GROVE ST | PHILLIPS ST | MYRTLE ST | TBD | 2 Weeks | |
| Beacon Hill | MOUNT VERNON ST | HANCOCK ST | CHARLES ST | TBD | 2 Weeks | |
| Beacon Hill | PINCKNEY ST | CHARLES ST | DAVID G. MUGAR WY | TBD | 2 Weeks | |
| Beacon Hill | REVERE ST | CHARLES ST | DAVID G. MUGAR WY | TBD | 2 Weeks | |
| Beacon Hill | RIVER ST | CHESTNUT ST | MT VERNON ST | TBD | 2 Weeks | |
| Boston Proper | ARCH ST | MILK ST | FRANKLIN ST | TBD | 2 Weeks | |
| Boston Proper | BROAD ST | STATE ST | HIGH ST | APRIL | APRIL - NOVEMBER | UNDER CONSTRUCTION |
| Boston Proper | BROMFIELD ST | WASHINGTON ST | TREMONT ST | TBD | 2 Weeks | |
| Boston Proper | CONGRESS ST | SUDBURY ST | NORTH ST | TBD | 2 Weeks | 2011 Utility work has delayed paving until 2012 |
| Boston Proper | CONGRESS ST | EXCHANGE PLACE | WATER ST | TBD | 2 Weeks | Major MBTA project near by has delayed paving until 2012 |
| Boston Proper | DEVONSHIRE ST | STATE ST | FRANKLIN ST | TBD | 2 Weeks | Major MBTA project near by has delayed paving until 2012 |
| Boston Proper | DEVONSHIRE ST | FRANKLIN ST | SUMMER ST | TBD | 2 Weeks | |
| Boston Proper | FRANKLIN ST | DEVONSHIRE ST | SUMMER ST | TBD | 2 Weeks | Major MBTA project near by has delayed paving until 2012 |
| Boston Proper | MERRIMAC ST | NEW CHARDEN ST | PORTLAND ST | TBD | 2 Weeks | |
| Boston Proper | NORTH ST | CONGRESS ST | BLACKSTONE ST | TBD | 2 Weeks | |
| Boston Proper | PEARL ST | CONGRESS ST | FRANKLIN ST | TBD | 2 Weeks | Major MBTA project near by has delayed paving until 2012 |
| Boston Proper | PEARL ST | PURCHASE ST | WATER ST | TBD | 2 Weeks | |
| Boston Proper | TEMPLE PL | WASHINGTON ST | TREMONT ST | TBD | 2 Weeks | |
| Boston Proper | TREMONT ST | PARK ST | AVERY ST | TBD | 2 Weeks | |
| Boston Proper | WEST ST | WASHINGTON ST | TREMONT ST | TBD | 2 Weeks | |
| Charlestown | ARMORY ST | MAIN ST | DEAD END | TBD | 2 Weeks | |
| Charlestown | BELMONT ST | BUNKER HILL ST | MEDFORD ST | TBD | 2 Weeks | |
| Charlestown | BUNKER HILL ST | TUFTS ST | LEXINGTON ST | TBD | 2 Weeks | |
| Charlestown | COOK ST | BUNKER HILL ST | MEDFORD ST | TBD | 2 Weeks | |
| Charlestown | COREY ST | MOULTON ST | MEDFORD ST | TBD | 2 Weeks | |
| Charlestown | FRANKLIN ST | MAIN ST | HIGH ST | TBD | 2 Weeks | |
| Charlestown | HIGH ST | PEARL ST | SULLIVAN ST | TBD | 2 Weeks | |
| Charlestown | LAWRENCE ST | UNION ST | AUSTIN ST | TBD | 2 Weeks | |
| Charlestown | MOULTON ST | BUNKER HILL ST | MOULTON WAY | TBD | 2 Weeks | |
| Charlestown | SALEM ST AV | SALEM ST | HIGH ST | TBD | 2 Weeks | |
| Charlestown | SEMINARY ST | AUSTIN ST | LAWRENCE ST | TBD | 2 Weeks | |
| Charlestown | SOLEY ST | MONUMENT SQ | WARREN ST | TBD | 2 Weeks | |
| Charlestown | UNION ST | MAIN ST | WASHINGTON ST | TBD | 2 Weeks | |
| Charlestown | VINE ST | CHELSEA ST | BUNKER HILL ST | TBD | 2 Weeks | |
| Charlestown | WARREN ST | HENLEY ST | SOLEY ST | TBD | 2 Weeks | |
| Dorchester | ADAMS ST S | MEDWAY ST | MILTON TOWN LINE | ACTIVE | 2 Weeks | MWRA Resurfacing Project |
| Dorchester | ALBION ST | DUDLEY ST | CLIFTON ST | TBD | 2 Weeks | |
| Dorchester | ALEXANDER ST | DUDLEY ST | OLEANDER ST | TBD | 2 Weeks | |
| Dorchester | ALEXANDER ST | OLEANDER ST | BIRD ST W | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Dorchester | ASHMONT ST | ADAMS ST | FREEPORT ST | TBD | 2 Weeks | |
| Dorchester | BAKER AV | QUINCY ST | BODWELL ST | TBD | 2 Weeks | National Grid installed new gas main in 2011/ Paving to take place in spring 2012 |
| Dorchester | BIRD ST | CEYLON ST | MAGNOLIA ST | TBD | 2 Weeks | |
| Dorchester | BIRD ST | MONADNOCK ST | RAIL LINE | TBD | 2 Weeks | |
| Dorchester | BRADSHAW ST | GLENWAY ST | BICKNELL ST | TBD | 2 Weeks | NSTAR Electric to install new conduit delaying paving until 2012 |
| Dorchester | BROOKVIEW ST | BLUE HILL AV | HARVARD ST | TBD | 2 Weeks | |
| Dorchester | BULLARD ST | BOWDOIN AV | ROSSETER ST | TBD | 2 Weeks | |
| Dorchester | BURRELL ST | CLIFTON ST | NORFOLK AV | TBD | 2 Weeks | |
| Dorchester | CARMEN ST | VASSAR ST | NORWELL ST | TBD | 2 Weeks | |
| Dorchester | CAWFIELD ST | ELDER ST | EASTMAN ST | TBD | 2 Weeks | |
| Dorchester | CENTRE ST | CENTRE AV | DORCHESTER AV | TBD | 2 Weeks | National Grid installed new main in 2011/ Paving will now take place in 2012 |
| Dorchester | CHAMPLAIN CIR | SCHOOL ST | DEAD END | TBD | 2 Weeks | |
| Dorchester | CHARLOTTE ST | BLUE HILL AV NB | BRADSHAW ST | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Dorchester | CLAYBOURNE ST | BOWDOIN ST | PARK ST | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Dorchester | COLEMAN ST | HENDRY ST | QUINCY ST | TBD | 2 Weeks | |
| Dorchester | COLEUS PARK | LAWRENCE AV | INTERVALE ST | TBD | 2 Weeks | |
| Dorchester | CORONA ST | GENEVA AV | BOWDOIN ST | TBD | 2 Weeks | |
| Dorchester | DEAN ST | HOWARD AV | JUDSON ST | TBD | 2 Weeks | |
| Dorchester | DEERING RD | BLUE HILL AV SB | HARVARD ST | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Dorchester | EASTMAN ST | ELDER ST | COLUMBIA RD | TBD | 2 Weeks | |
| Dorchester | EDISON GREEN N | DORCHESTER AV | POND ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Dorchester | ELDER ST | COLUMBIA RD | HUMPHREYS ST | TBD | 2 Weeks | |
| Dorchester | ELMHURST ST | NORFOLK ST | SOUTHERN AV | TBD | 2 Weeks | |
| Dorchester | EUCLID ST | WASHINGTON ST | WITHINGTON ST | TBD | 2 Weeks | |
| Dorchester | FENDALE AV | WASHINGTON ST | NEVADA ST | TBD | 2 Weeks | |
| Dorchester | FERNBORO ST | LAWRENCE AV | INTERVALE ST | TBD | 2 Weeks | |
| Dorchester | GLENARM ST | WASHINGTON ST | SEAVER ST | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Dorchester | GLENROSE RD | ADAMS ST N | ST MARKS RD | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Dorchester | GREENOCK ST | BLUE HILL AV SB | HARVARD ST | TBD | 2 Weeks | COMPLETED |
| Dorchester | HALF MOON ST | MAGNOLIA ST | LINGARD ST | TBD | 2 Weeks | |
| Dorchester | HALLET ST | MINOT ST | GALLIVAN BLVD | TBD | 2 Weeks | |
| Dorchester | HANSBOROUGH ST | BLUE HILL AV | HARVARD ST | TBD | 2 Weeks | |
| Dorchester | HARTFORD ST | HOWARD ST | CHAMBLET ST | TBD | 2 Weeks | |
| Dorchester | HILLSBORO RD | WELLINGTON HILL RD | HAZELTON ST | TBD | 2 Weeks | |
| Dorchester | HOWARD AV | DEWEY ST | WAYLAND ST | TBD | 2 Weeks | |
| Dorchester | HUMPHREYS ST | EAST COTTAGE ST | DUDLEY ST | TBD | 2 Weeks | |
| Dorchester | JOSEPHINE ST | GENEVA AV | DITSON ST | TBD | 2 Weeks | COMPLETED |
| Dorchester | LAWRENCE AV | FERNBORO ST | MAGNOLIA ST | TBD | 2 Weeks | |
| Dorchester | LEEDSVILLE ST | DORCHESTER AV | ADAMS ST | TBD | 2 Weeks | |
| Dorchester | LEYLAND ST | EAST COTTAGE ST | BURGESS ST | TBD | 2 Weeks | |
| Dorchester | LINDSEY ST | WALDECK ST | GREENBRIER ST | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Dorchester | LINGARD ST | MAGNOLIA ST | HARTFORD ST | TBD | 2 Weeks | |
| Dorchester | LYNDHURST ST | ALLSTON ST | WASHINGTON ST | TBD | 2 Weeks | |
| Dorchester | MAGNOLIA ST | DUDLEY ST | QUINCY ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Dorchester | MATHER ST | DORCHESTER AV | NIXON ST | TBD | 2 Weeks | |
| Dorchester | MAYFIELD ST | DORCHESTER AV | BAKERSFIELD ST | TBD | 2 Weeks | |
| Dorchester | MILLS ST | ROCKLAND ST | DALE ST | TBD | 2 Weeks | |
| Dorchester | MOUNTAIN AV | WOODROW AV | BALLOU AV | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Dorchester | NAHANT ST | ADAMS ST | NEWHALL ST | TBD | 2 Weeks | |
| Dorchester | OLDFIELDS RD | COLUMBIA RD | DEAD END | TBD | 2 Weeks | |
| Dorchester | OWENCROFT RD | GALLIVAN BLVD | CROFTLAND ST | TBD | 2 Weeks | |
| Dorchester | PERTH ST | FAYSTON ST | QUINCY ST | TBD | 2 Weeks | |
| Dorchester | POWELLTON RD | COLUMBIA RD NB | GLENARM ST | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Dorchester | RHOADES ST | BLUE HILL AV SB | MORTON ST | TBD | 2 Weeks | |
| Dorchester | RICHMOND ST | WASHINGTON ST | DORCHESTER AV | TBD | 2 Weeks | |
| Dorchester | RINGGOLD ST | HANSON ST | WALTHAM ST | TBD | 2 Weeks | |
| Dorchester | RIVER ST | WASHINGTON ST | OLD MORTON ST | MAY | 2 Weeks | UNDER CONSTRUCTION/ MWRA Paving project |
| Dorchester | ROMSEY ST | DORCHESTER AV | SYDNEY ST | TBD | 2 Weeks | |
| Dorchester | ROXTON ST | GLENWAY ST | GREENWOOD ST | TBD | 2 Weeks | |
| Dorchester | RUXTON RD | RUGBY RD | RIDLON RD | TBD | 2 Weeks | |
| Dorchester | SARGENT ST | HOWARD AV | HARTFORD ST | TBD | 2 Weeks | National Grid installed new main in 2011/ Paving will now take place in Spring of 2012 |
| Dorchester | SEDALIA RD | ELMER RD | BEAUMONT ST | TBD | 2 Weeks | |
| Dorchester | SPENCER ST | HARVARD ST | ATHELWOLD ST | TBD | 2 Weeks | |
| Dorchester | SPENCER ST | WHEATLAND ST | TALBOT AV | TBD | 2 Weeks | |
| Dorchester | ST MARKS RD | FLORIDA ST | ADAMS ST N | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Dorchester | STONEHURST ST | TOPLIFF ST | HAMILTON ST | TBD | 2 Weeks | |
| Dorchester | SUDAN ST | DORCHESTER AV | SYDNEY ST | TBD | 2 Weeks | |
| Dorchester | THANE ST | PARK ST | HARVARD ST | TBD | 2 Weeks | |
| Dorchester | THETFORD AV | NORFOLK ST | EVANS ST | TBD | 2 Weeks | |
| Dorchester | TUTTLE ST | SAVIN HILL AV | HARTLAND ST | TBD | 2 Weeks | |
| Dorchester | WASHINGTON ST | MORTON ST | DORCHESTER AV | MAY | 2 Weeks | UNDER CONSTRUCTION/MWRA Resurfacing Project |
| Dorchester | WENDOVER ST | DUDLEY ST | HUMPHREYS ST | TBD | 2 Weeks | |
| Dorchester | WESSEX ST | SHENANDOAH ST | DEAD END | TBD | 2 Weeks | |
| Dorchester | WEST COTTAGE ST | DUDLEY ST | BROOK ST | TBD | 2 Weeks | |
| Dorchester | WEST SELDEN ST | MORTON ST | HENRICI ST | TBD | 2 Weeks | |
| Dorchester | WEYANOKE ST | WESSEX ST | CARRUTH ST | TBD | 2 Weeks | |
| Dorchester | WEYANOKE ST | CARRUTH ST | BUSHNELL ST | TBD | 2 Weeks | National Grid installed main in 2011/ Delaying paving until 2012 |
| Dorchester | WHITFIELD ST | NORFOLK ST | SOUTHERN AV | TBD | 2 Weeks | |
| Dorchester | WILCOX RD | ELMER RD | BEAUMONT ST | TBD | 2 Weeks | |
| Dorchester | WILLIS ST | PLEASANT ST | SUMNER ST | TBD | 2 Weeks | |
| Dorchester | WILMINGTON AV | MILTON AV | NEVADA ST | TBD | 2 Weeks | National Grid installed main in 2011/ Delaying paving until Spring 2012 |
| East Boston | BENNINGTON ST | NEPTUNE ST | SWIFT ST | TBD | 2 Weeks | |
| East Boston | BENNINGTON ST WB | BREMEN ST | NEPTUNE RD | TBD | 2 Weeks | |
| East Boston | BROOKS ST | CHELSEA ST | BENNINGTON ST | TBD | 2 Weeks | |
| East Boston | CHELSEA ST | EAST EAGLE ST | CHELSEA TOWN LINE | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| East Boston | COTTAGE ST | WEBSTER ST | GOVE ST E | TBD | 2 Weeks | National Grid installed a new gas main in 2011 / Final Paving delayed until 2012 |
| East Boston | FALCON ST | BORDER ST | MERIDIAN ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| East Boston | FALCON ST | MERIDIAN ST | PUTNAM ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| East Boston | GOVE ST W | HAVRE ST S | CHELSEA ST | TBD | 2 Weeks | |
| East Boston | LEXINGTON ST | MERIDIAN ST | MARION ST | TBD | 2 Weeks | |
| East Boston | LEXINGTON ST | BORDERST | MERIDIAN ST | TBD | 2 Weeks | |
| East Boston | LEYDEN ST | BOARDMAN ST | BREED ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| East Boston | LEYDEN ST | BREED ST | BOARDMAN ST | TBD | 2 Weeks | |
| East Boston | MARGINAL ST E | ORLEANS ST | DEAD END | TBD | 2 Weeks | National Grid to install new gas main/ Will delay paving until 2012 |
| East Boston | SHELBY ST | LEXINGTON ST | SARATOGA ST | TBD | 2 Weeks | |
| East Boston | SUMNER ST | HAVRE ST S | ORLEANS ST | TBD | 2 Weeks | |
| Fenway | BAY STATE RD | BEACON ST | GRANBY ST | 2013 | 2 Weeks | Major construction and utility work will delay paving until 2013 |
| Fenway | BEACON ST | CHARLESGATE W | RALEIGH ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Fenway | BUCKNAN ST | FISHER AV | LAWN ST | TBD | 2 Weeks | |
| Fenway | HAVILAND ST | EDGERLY RD | HEMENWAY ST | TBD | 2 Weeks | Major developmet work in 2011/ Paving delayed until 2012 |
| Fenway | PALACE RD | LONGWOOD AV | FENWAY | TBD | 2 Weeks | |
| Fenway | PUBLIC ALLEY 809 | GAINSBOROUGH ST | SYMPHONY ST | TBD | 2 Weeks | |
| Fenway | PUBLIC ALLEY 811 | GAINSBOROUGH ST | SYMPHONY ST | TBD | 2 Weeks | |
| Fenway | QUEENSBERRY ST | JERSEY ST | PARK DR | TBD | 2 Weeks | |
| Fenway | ST ALBANS RD | HUNTINGTON AV | FRANCIS ST | TBD | 2 Weeks | |
| Fenway | UNIVERSITY RD | COMMONWEALTH AV EB | JAMES J STORROW DR | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Hyde Park | ALWIN ST | STONEHILL CIR | DEDHAM TOWN LINE | MAY | 2 Weeks | COMPLETED |
| Hyde Park | ANDRIA RD | GEORGE ST | DEAD END | TBD | 2 Weeks | |
| Hyde Park | BUSINESS ST | RIVER ST | RIVER ST | TBD | 2 Weeks | Major BWSC work in 2011 delayed paving until 2012 |
| Hyde Park | EVERETT ST | CENTRAL AV | HYDE PARK AV | TBD | 2 Weeks | NSTAR Gas to install new gas main/ Will delay paving until 2012 |
| Hyde Park | FARADAY ST | TRUMAN PKWY NB | WASHINGTON ST | TBD | 2 Weeks | NSTAR Gas installed new gas main in 2011/ Street will be paved in 2012 |
| Hyde Park | FARRAR AV | TACOMA ST | WOOD AV | MAY | 2 Weeks | COMPLETED |
| Hyde Park | GARFIELD AV | TRUMAN PKWY NB | WASHINGTON ST | TBD | 2 Weeks | NSTAR Gas installed new gas main in 2011/ Street will be paved in 2012 |
| Hyde Park | HOLMFIELD AV | RIVER ST | DEAD END | MAY | 2 Weeks | COMPLETED |
| Hyde Park | JOYCE RD | WOOD AV | GEORGE ST | MAY | 2 Weeks | COMPLETED |
| Hyde Park | LOCHLAND RD | MILTON AV | SUMMIT ST | MAY | 2 Weeks | |
| Hyde Park | MILLSTONE ST | HYDE PARK AVE | COLCHESTER ST | TBD | 2 Weeks | |
| Hyde Park | PARK ST | WESTMINSTER ST | ARLINGTON ST | MAY | 2 Weeks | COMPLETED |
| Hyde Park | PINGREE ST | HYDE PARK AV | DANA AV | TBD | 2 Weeks | NSTAR Gas to install new gas main in 2012/ Paving will take place Fall 2012 |
| Hyde Park | PRESCOTT ST | HYDE PARK AV | DEAD END | MAY | 2 Weeks | COMPLETED |
| Hyde Park | READVILLE ST | COMO RD | WEST MILTON ST | TBD | 2 Weeks | NSTAR Gas installed new gas main in 2011/ Street will be paved in 2012 |
| Hyde Park | REYNOLD RD | CHESTERFIELD ST | COMO RD | TBD | 2 Weeks | |
| Hyde Park | RIVER ST | GORDON AV | RESERVATION RD | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Hyde Park | RIVER ST | RESERVATION RD | TURTLE POND PARKWAY | TBD | 2 Weeks | |
| Hyde Park | ROSEGLEN RD | BIRCHCROFT RD | DEAD END | TBD | 2 Weeks | NSTAR Gas to install new gas main in 2012/ Paving will take place Fall 2012 |
| Hyde Park | STANBRO ST | COLCHESTER ST | HYDE PARK AV | TBD | 2 Weeks | |
| Hyde Park | WASHINGTON ST | CHITTICK RD | NEEDHAM RD | TBD | 2 Weeks | |
| Hyde Park | WASHINGTON ST | GARFIELD AV | CHITTICK RD | TBD | 2 Weeks | NSTAR Gas installed new gas main in 2011/ Street will be paved in 2012 |
| Hyde Park | WATERLOO ST | READVILLE ST | NEPONSET VALLEY PKWY N | APRIL | 2 Weeks | COMPLETED |
| Hyde Park | WINDHAM RD | DALE ST | AUSTIN ST | MAY | 2 Weeks | COMPLETED |
| Jamaica Plain | BALLARD ST | CENTRE ST | CUSTER ST | TBD | 2 Weeks | Utility work in 2011 delayed Final paving until 2012 |
| Jamaica Plain | CALL ST | EVERETT ST | MCBRIDE ST | TBD | 2 Weeks | |
| Jamaica Plain | CHESTNUT AV | BOYLSTON ST | SHERIDAN ST | TBD | 2 Weeks | |
| Jamaica Plain | ELDRIDGE ST | HYDE PARK AV | PATTEN ST | TBD | 2 Weeks | |
| Jamaica Plain | ELM ST | GREEN ST | SEAVERNS AV | TBD | 2 Weeks | |
| Jamaica Plain | ELWELL RD | ALLANDALE ST | DEAD END | APRIL | 2 Weeks | COMPLETED |
| Jamaica Plain | EVERGREEN ST | DAY ST | SOUTH HUNTINGTON AV | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Jamaica Plain | GLEN RD | WASHINGTON ST | FOREST HILLS ST | TBD | 2 Weeks | |
| Jamaica Plain | GROVENOR RD | CENTRE ST | POND ST E | TBD | 2 Weeks | |
| Jamaica Plain | GROVENOR RD | POND ST | CENTRE ST | TBD | 2 Weeks | |
| Jamaica Plain | HOLBROOK ST | CENTRE ST | DANE ST | TBD | 2 Weeks | |
| Jamaica Plain | MORAINE ST | CENTRE ST | JAMAICAWAY | TBD | 2 Weeks | |
| Jamaica Plain | NEWBERN ST | BISHOP ST | CAROLINA AV | TBD | 2 Weeks | New Gas Main will delay paving until 2012 |
| Jamaica Plain | ORGAN PARK ST | DEAD END | CATHERINE ST | APRIL | 2 Weeks | COMPLETED |
| Jamaica Plain | POND CIR | POND ST W | POND ST W | TBD | 2 Weeks | National Grid installed a new gas main in 2011 / Final Paving delayed until 2012 |
| Jamaica Plain | POND VIEW AV | PERKINS ST | PERSHING RD | TBD | 2 Weeks | |
| Jamaica Plain | SEDGWICK ST | ELM ST | JOHN A ANDREW ST | TBD | 2 Weeks | |
| Mattapan | ANDRIA RD | GEORGE ST | DEAD END | MAY | 2 Weeks | COMPLETED |
| Mattapan | CLEARWATER DR | MORTON ST | MARYKNOLL ST | TBD | 2 Weeks | |
| Mattapan | COURTLAND RD | MORTON ST | HARVARD ST | TBD | 2 Weeks | |
| Mattapan | FAIRWAY ST | CUMMINS HWY NB | BLUE HILL AV SB | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Mattapan | HARVARD ST | WALKHILL ST | CUMMINGS HWY | APRIL | 2 Weeks | COMPLETED |
| Mattapan | HIAWATHA RD | BLUE HILL AV SB | FOTTLER RD | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Mattapan | HOLLINGSWORTH ST | CUMMINS HWY | DEAD END | TBD | 2 Weeks | |
| Mattapan | ITASCA ST | ALMONT ST | CUMMINS HWY | TBD | 2 Weeks | |
| Mattapan | JOYCE RD | WOOD AV | GEORGE ST | MAY | 2 Weeks | COMPLETED |
| Mattapan | LINDVALE TER | MAMELON CIR | GLADESIDE AV | TBD | 2 Weeks | |
| Mattapan | LORNA RD | MORTON ST | DOONE AV | TBD | 2 Weeks | |
| Mattapan | MAMELON CIR | RIVER ST | RIVER ST | TBD | 2 Weeks | |
| Mattapan | MASSASOIT ST | RIVER ST | DEAD END | APRIL | 2 Weeks | COMPLETED |
| Mattapan | ORMOND ST | OUTLOOK RD | WELLINGTON HILL ST | TBD | 2 Weeks | |
| Mattapan | POYDRAS ST | RIVER ST | DEAD END | TBD | 2 Weeks | |
| Mattapan | REXFORD ST | BLUE HILL AV SB | CUMMINS HWY NB | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Mattapan | RIDGEVIEW AV | RIVER ST | DEAD END | TBD | 2 Weeks | |
| Mattapan | RIVER ST | CUMMINS HWY | WACHUSETT ST | April- November | 6 MONTHS | UNDER CONSTRUCTION/ Sidewalk and traffic improvements to start in Fall 2011/ Roadway to be completed in 2012 |
| Mattapan | VERRILL ST | MORTON ST | WOOLSON ST | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Mattapan | WILDWOOD ST | MORTON ST | MIDDLETON ST | TBD | 2 Weeks | |
| Mission Hill | LAWN ST | ESTEY ST | BUCKNAN ST | TBD | 2 Weeks | |
| Mission Hill | SACHEM ST | CALUMET ST | HILLSIDE ST | MAY | 2 Weeks | COMPLETED |
| Mission Hill | ST ALPHONSUS ST | LONGWOOD AV | SMITH ST | TBD | 2 Weeks | |
| North End | BATTERY ST | HANOVER ST | COMMERCIAL ST | TBD | 2 Weeks | |
| North End | RICHMOND ST | NORTH ST | HANOVER ST N | TBD | 2 Weeks | 2011 Utility work delayed Final Paving until 2012 |
| North End | SALEM ST | CROSS ST | CHARTER ST | October | 2 Weeks | NSTAR Electric to complete work by June - Paving in Fall |
| Roslindale | BEECHLAND ST | WASHINGTON ST | BERAM AV | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Roslindale | CUMMINS HWY | WASHINGTON ST | HARDING RD | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Roslindale | CUMMINS HWY | WASHINGTON ST | HARDING RD | April- November | 6 Months | UNDER CONSTRUCTION/Reconstruction project/ Scheduled to start Spring 2012 |
| Roslindale | HASLET ST | ROSLINDALE AV | METCALF ST | TBD | 2 Weeks | |
| Roslindale | HILLVIEW AV | WHITFORD ST | CRANDALL ST | TBD | 2 Weeks | |
| Roslindale | METROPOLITIAN AV | AUGUSTUS AV | POPLAR ST | MAY | 2 Weeks | |
| Roslindale | PENFIELD ST | METCALF ST | BIRCH ST | TBD | 2 Weeks | |
| Roxbury | ALBION ST | DUDLEY ST | CLIFTON ST | TBD | 2 Weeks | |
| Roxbury | CABOT ST | RUGGLES ST | WHITTIER ST | TBD | 2 Weeks | |
| Roxbury | CLEVELAND ST | WINTHROP ST | MORELAND ST | TBD | 2 Weeks | |
| Roxbury | COBDEN ST | WALNUT AV | WASHINGTON ST | TBD | 2 Weeks | Trench repair to be completed in October or November. Depending on the weather conditions the street will be resurfaced in late fall or early next spring. Will update status later this fall. |
| Roxbury | CRAWFORD ST | WARREN AV | HUMBOLDT AV | TBD | 2 Weeks | |
| Roxbury | DALE ST | WALNUT AV | WASHINGTON ST | TBD | 2 Weeks | |
| Roxbury | DEWITT DR | KERR PL | SHAWMUT AV | TBA | 2 Weeks | 2011 Utility work will delay paving until 2012 |
| Roxbury | GREENWICH CT | GREENWICH ST | DEAD END | May-August | 4 Months | UNDER CONSTRUCTION/Reconstruction Project/ Scheduled for 2012 |
| Roxbury | GREENWICH ST | WESTMINSTER ST | WARWICK ST | May-August | 4 Months | UNDER CONSTRUCTION/Reconstruction Project/ Scheduled for 2012 |
| Roxbury | HAMMOND ST | SHAWMUT AV | TREMONT ST | May-August | 4 Months | UNDER CONSTRUCTION/Reconstruction Project/ Scheduled for 2012 |
| Roxbury | HAROLD ST | CRAWFORD ST | SEAVER ST | TBD | 2 Weeks | |
| Roxbury | HAROLD ST | HOLWORTHY ST | TOWNSEND ST | TBD | 2 Weeks | |
| Roxbury | HOWLAND ST | HUMBOLDT AV | HAROLD ST S | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Roxbury | HOWLAND ST | WARREN ST | ELM HILL ST | TBD | 2 Weeks | |
| Roxbury | HUTCHINGS ST | ELM HILL AV | HAROLD ST | TBD | 2 Weeks | |
| Roxbury | LENOX ST | WASHINGTON ST | TREMONT ST | TBD | 2 Weeks | |
| Roxbury | LINWOOD SQ | LINWOOD ST | HIGHLAND AV | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Roxbury | LINWOOD ST | HIGHLAND ST | CENTRE ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| Roxbury | MARBURY TER | AMORY ST | DEAD END | TBD | 2 Weeks | COMPLETED |
| Roxbury | NEW MARKET SQ E | SOUTHAMPTON ST | NEW MARKET SQ W | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Roxbury | NEW MARKET SQ W | MASSACHUSETTS AV | NEW MARKET SQ N | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| Roxbury | OTISFIELD ST | GASTON ST | BLUE HILL AV | TBD | 2 Weeks | |
| Roxbury | ROXBURY ST | CENTRE ST | ELMWOOD ST | TBD | 2 Weeks | |
| Roxbury | RUTHVEN ST | ELM HILL AV | HAROLD ST | TBD | 2 Weeks | |
| Roxbury | RUTHVEN ST | HAROLD ST | WALNUT AV | TBD | 2 Weeks | |
| Roxbury | SUSSEX ST | HAMMOND ST | WARWICK ST | May-August | 4 Months | UNDER CONSTRUCTION /Reconstruction Project/ Scheduled for 2012 |
| Roxbury | WARWICK ST | HAMMOND ST | WINDSOR ST | May-August | 4 Months | UNDER CONSTRUCTIONReconstruction Project/ Scheduled for 2012 |
| Roxbury | WESTMINSTER ST | HAMMOND ST | GREENWICH ST | May-August | 4 Months | ACTIVE RECONSTRUCTION/Reconstruction Project/ Scheduled for 2012 |
| Roxbury | WHITING ST | WARREN ST | MORELAND ST | TBD | 2 Weeks | |
| Roxbury | WINDSOR ST | SHAWMUT AV | WARWICK ST | May-August | 4 Months | UNDER CONSTRUCTION/Reconstruction Project |
| South Boston | A ST | NECCO ST | CONGRESS ST | TBA | 2 Weeks | 2011 BRA project, on hold until 2012 |
| South Boston | BOWEN ST | D ST | E ST | TBA | 2 Weeks | National Grid to install new main 2012/ Street on hold till after completion of work |
| South Boston | BOWEN ST | F ST | DORCHESTER ST | TBA | 2 Weeks | National Grid to install new main 2012/ Street on hold till after completion of work |
| South Boston | BREWSTER ST | EAST SEVENTH ST | EAST EIGHTH ST | TBD | 2 Weeks | National Grid installed new gas main in 2011/ Delayed paving until 2012 |
| South Boston | DEVINE WAY | OLD COLONY AV | DORCHESTER AV | JUNE | 2 Weeks | |
| South Boston | GAVIN WAY | O'CALLAHAN WAY | LOGAN WAY | JUNE | 2 Weeks | |
| South Boston | O'CONNER WAY | DORCHESTER AV | KEMP ST | JUNE | 2 Weeks | |
| South Boston | SILVER ST | G ST | DORCHESTER ST | TBD | 2 Weeks | |
| South Boston | SPRINGER ST | EAST EIGHTH ST | EAST SEVENTH ST | TBD | 2 Weeks | National Grid installed new gas main in 2011/ Delayed paving until 2012 |
| South Boston | WEST EIGHTH ST | D ST | E ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| South End | APPLETON ST | TREMONT ST | DARTMOUTH ST | TBD | 2 Weeks | |
| South End | CLARENDON ST | TREMONT ST | COLUMBUS AV N | TBD | 2 Weeks | |
| South End | DWIGHT ST | SHAWMUT AV | TREMONT ST | TBD | 2 Weeks | |
| South End | DWIGHT ST | SHAWMUT AV | TREMONT ST | TBD | 2 Weeks | |
| South End | EAST SPRINGFIELD ST | WASHINGTON ST | HARRISON AV | TBD | 2 Weeks | Utility work in 2011 delayed paving until 2012 |
| South End | GREENWICH PK | COLUMBUS AV N | CLAREMONT ST | JULY | 2 Weeks | |
| South End | HARRISON AV | MASSACHUSETTS AV | EAST LENOX ST | TBD | 2 Weeks | |
| South End | PAUL PL | SHAWMUT AV | HERALD ST | TBD | 2 Weeks | |
| South End | PUBLIC ALLEY 810 | PUBLIC ALLEY 809 | PUBLIC ALLEY 811 | TBD | 2 Weeks | |
| South End | SHAWMUT ST | PIEDMONT ST | CHURCH ST | TBD | 2 Weeks | |
| South End | ST GEORGE ST | EAST BROOKLINE ST | EAST NEWTON ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| South End | UNION PARK ST | WASHINGTON ST | HARRISON AV | TBD | 2 Weeks | National Grid installed new gas main in 2011/ Delaying paving until 2012 |
| South End | UPTON ST | TREMONT ST | SHAWMUT AV | TBD | 2 Weeks | |
| South End | WEST CONCORD ST | SHAWMUT AV | TREMONT ST | TBD | 2 Weeks | Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012 |
| South End | WEST RUTLAND SQ | COLUMBUS AV | DEAD END | TBD | 2 Weeks | |
| West Roxbury | ANAWAN TER | ANAWAN AV | DEAD END | TBD | 2 Weeks | |
| West Roxbury | ASHFIELD ST | WALTER ST | FAIRVIEW ST | TBD | 2 Weeks | |
| West Roxbury | CHISHOLM RD | POPLAR ST | CORNELL ST | MAY | 2 Weeks | |
| West Roxbury | CHISHOLM TER | CHISHOLM RD | DEAD END | MAY | 2 Weeks | |
| West Roxbury | CRANDALL ST | AUGUSTUS AV | HILLVIEW ST | TBD | 2 Weeks | |
| West Roxbury | FARMINGTON RD | VFW PARKWAY | WESTOVER ST | TBD | 2 Weeks | |
| West Roxbury | GLENDOWER RD | POPLAR ST | KITTREDGE ST | MAY | 2 Weeks | |
| West Roxbury | GRAHAM TER | MAPLE ST | DEAD END | TBD | 2 Weeks | |
| West Roxbury | GRAYFIELD AV | COREY ST | HOUSTON ST | TBD | 2 Weeks | |
| West Roxbury | HEATHCOTE ST | POPLAR ST | HAWTHORNE ST | MAY | 2 Weeks | |
| West Roxbury | HOUSTON ST | MONTVIEW ST | GRAYFIELD AV | TBD | 2 Weeks | |
| West Roxbury | KNOLL ST | WALTER ST | CENTRE ST | TBD | 2 Weeks | National Grid installed new gas main in 2011/ Will delay paving until 2012 |
| West Roxbury | MANTHORNE RD | CENTRE ST | WELD ST | TBD | 2 Weeks | |
| West Roxbury | MAPLE ST | CENTRE ST | GARTH RD | TBD | 2 Weeks | |
| West Roxbury | ORIOLE ST | PARK ST | WREN ST | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| West Roxbury | TENNYSON ST | BELLEVUE ST | WOODARD RD | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |
| West Roxbury | WILLOWDEAN AV | PARKLAWN RD | COURTNEY RD | TBD | 2 Weeks | |
| West Roxbury | WOODARD RD | WREN ST | BELLEVUE ST | TBD | TBA | Reconstruction Project/ Scheduled for 2012 |