The Boston Public Works Construction Management Division is currently in the process of establishing the finalized Roadway Resurfacing and Reconstruction Program list for the 2012 Construction Season. Candidates for resurfacing and reconstruction must first be reviewed by a City Engineer to establish the extent of repairs. If approved, candidates are then cleared by 26 various utility companies and agencies that perform the majority of excavation work throughout the City of Boston.

Once each entity has cleared the proposed resurfacing candidate and indicated that they have no planned projects that will require roadway excavation in the next five years, the entry can be considered for addition to the annual Roadway Resurfacing and Reconstruction Program.

Projects listed below were previously cleared and scheduled for the 2011 Roadway Resurfacing and Reconstruction Program, but are now scheduled to take place during the 2012 Construction Season. The complete list of resurfacing and reconstruction Capital Projects to be performed during the 2012 Construction Season is estimated to be released by late March.

Any questions or concerns regarding proposed resurfacing or reconstruction candidates may be directed to the Construction Management Division by calling 617-635-4951.

Fact Sheet


Search By:     Or By:
NeighborhoodStreetFrom StreetTo StreetEstimated StartDurationStatus
Allston/BrightonBERTRAM STNORTH HARVARD STTRAVIS STTBD2 Weeks 
Allston/BrightonBLENFORD RDCOLBORNE STDEAD ENDTBD2 Weeks 
Allston/BrightonBRAYTON RDBRECK AVNEWTON TOWN LINETBD2 Weeks 
Allston/BrightonBROOKS STFANEUIL STNEWTON STTBD2 Weeks 
Allston/BrightonCALTHA RDUNDINE RDDEAD ENDTBD2 Weeks 
Allston/BrightonCHISWICK RDSELKIRK RDSERVICE RD (COMM AV)TBD2 Weeks 
Allston/BrightonCUFFLIN STTREMONT STNONANTUM STTBD2 WeeksUtility Trench permanently repaired in Fall 2011/ Final Paving scheduled for Spring 2012
Allston/BrightonDUNBOY STPERTHSHIRE RDBIGELOW STTBD2 Weeks 
Allston/BrightonDUNCKLEE STHARRIET STMADELINE STTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
Allston/BrightonELEANOR STRIDGEMONT STCAMBRIDGE STTBD2 Weeks 
Allston/BrightonEMBASSY RDCHESTNUT HILL AVPORTINA RDTBD2 Weeks 
Allston/BrightonGERRISH STBROOKS STDEAD ENDTBD2 Weeks 
Allston/BrightonGLENMONT RDWILLOUGHBY STFOSTER STTBD2 Weeks 
Allston/BrightonGLENMONT RDFOSTER STLAKE STTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
Allston/BrightonGREYCLIFF RDFOSTER STCOMMONWEALTH AVTBD2 Weeks 
Allston/BrightonHARRIET STPARSONS STFANEUIL STTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
Allston/BrightonHOOKER STNORTH HARVARD STDEAD ENDTBD2 Weeks 
Allston/BrightonHOOKER STROYAL STNORTH HARVARD STTBD2 Weeks 
Allston/BrightonKEENAN RDMARKET STRYAN RDTBD2 Weeks 
Allston/BrightonKENRICK STLAKE SHORE RDNEWTON TOWN LINETBD2 Weeks 
Allston/BrightonKINGSLEY STNORTH HARVARD STTRAVIS STTBD2 Weeks 
Allston/BrightonLITCHFIELD STHOLTON STWESTERN AVTBD2 Weeks 
Allston/BrightonMADELINE STHARRIET STFANEUIL STTBD2 Weeks Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
Allston/BrightonMALIA TERBEACON STNEWTON TOWN LINETBD2 Weeks 
Allston/BrightonNILES STPARSONS STDEAD ENDTBD2 Weeks 
Allston/BrightonNORTH HARVARD STWESTERN AVCAMBRIDGE STAPRIL2 WeeksCOMPLETED
Allston/BrightonPARK VALE AVGLENVILLE AVBRIGHTON AV EBTBDTBAReconstruction Project/ Scheduled for 2012
Allston/BrightonPARSONS STWASHINGTON STSURREY STTBD2 Weeks 
Allston/BrightonPRESENTATION RDWASHINGTON STDEAD ENDTBD2 Weeks 
Allston/BrightonRIVERDALE STWESTERN AVRAYMOND STTBD2 Weeks 
Allston/BrightonRYAN RDKEENAN RDDEAD ENDTBD2 Weeks 
Allston/BrightonTIP TOP STWASHINGTON STTREMONT STTBD2 Weeks 
Allston/BrightonTRAPELO STLAKE STWILLOUGHBY STTBD2 Weeks 
Allston/BrightonTRAPELO STWILLOUGHBY STGLENMONT RDTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
Allston/BrightonUNDINE RDLAKE STLAKE STTBD2 Weeks 
Allston/BrightonUPCREST RDBROOKS STDEAD ENDTBD2 Weeks 
Allston/BrightonWILLOUGHBY STGLENMONT RDROGERS PARK AVTBD2 Weeks 
Back BayFAIRFIELD STNEWBURY STBOYLSTON STTBD2 WeeksNational Grid installed a new gas main in 2011 Delaying paving until 2012
Back BayPUBLIC ALLEY 905MASSACHUSETTS AVMARLBOROUGH STTBD2 Weeks 
Beacon HillANDERSON STCAMBRIDGE STPINCKNEY STTBD2 Weeks 
Beacon HillDERNE STBOWDOIN STMYRTLE STTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
Beacon HillGROVE STPHILLIPS STMYRTLE STTBD2 Weeks 
Beacon HillMOUNT VERNON STHANCOCK STCHARLES STTBD2 Weeks 
Beacon HillPINCKNEY STCHARLES STDAVID G. MUGAR WYTBD2 Weeks 
Beacon HillREVERE STCHARLES STDAVID G. MUGAR WYTBD2 Weeks 
Beacon HillRIVER STCHESTNUT STMT VERNON STTBD2 Weeks 
Boston ProperARCH STMILK STFRANKLIN STTBD2 Weeks 
Boston ProperBROAD STSTATE STHIGH STAPRILAPRIL - NOVEMBERUNDER CONSTRUCTION
Boston ProperBROMFIELD STWASHINGTON STTREMONT STTBD2 Weeks 
Boston ProperCONGRESS STSUDBURY STNORTH STTBD2 Weeks 2011 Utility work has delayed paving until 2012
Boston ProperCONGRESS STEXCHANGE PLACEWATER STTBD2 WeeksMajor MBTA project near by has delayed paving until 2012
Boston ProperDEVONSHIRE STSTATE STFRANKLIN STTBD2 WeeksMajor MBTA project near by has delayed paving until 2012
Boston ProperDEVONSHIRE STFRANKLIN STSUMMER STTBD2 Weeks 
Boston ProperFRANKLIN STDEVONSHIRE STSUMMER STTBD2 WeeksMajor MBTA project near by has delayed paving until 2012
Boston ProperMERRIMAC STNEW CHARDEN STPORTLAND STTBD2 Weeks 
Boston ProperNORTH STCONGRESS STBLACKSTONE STTBD2 Weeks 
Boston ProperPEARL STCONGRESS STFRANKLIN STTBD2 WeeksMajor MBTA project near by has delayed paving until 2012
Boston ProperPEARL STPURCHASE STWATER STTBD2 Weeks 
Boston ProperTEMPLE PLWASHINGTON STTREMONT STTBD2 Weeks 
Boston ProperTREMONT STPARK STAVERY STTBD2 Weeks 
Boston ProperWEST STWASHINGTON STTREMONT STTBD2 Weeks 
CharlestownARMORY STMAIN STDEAD ENDTBD2 Weeks 
CharlestownBELMONT STBUNKER HILL STMEDFORD STTBD2 Weeks 
CharlestownBUNKER HILL STTUFTS STLEXINGTON STTBD2 Weeks 
CharlestownCOOK STBUNKER HILL STMEDFORD STTBD2 Weeks 
CharlestownCOREY STMOULTON STMEDFORD STTBD2 Weeks 
CharlestownFRANKLIN STMAIN STHIGH STTBD2 Weeks 
CharlestownHIGH STPEARL STSULLIVAN STTBD2 Weeks 
CharlestownLAWRENCE STUNION STAUSTIN STTBD2 Weeks 
CharlestownMOULTON STBUNKER HILL STMOULTON WAYTBD2 Weeks 
CharlestownSALEM ST AVSALEM STHIGH STTBD2 Weeks 
CharlestownSEMINARY STAUSTIN STLAWRENCE STTBD2 Weeks 
CharlestownSOLEY STMONUMENT SQWARREN STTBD2 Weeks 
CharlestownUNION STMAIN STWASHINGTON STTBD2 Weeks 
CharlestownVINE STCHELSEA STBUNKER HILL STTBD2 Weeks 
CharlestownWARREN STHENLEY STSOLEY STTBD2 Weeks 
DorchesterADAMS ST SMEDWAY STMILTON TOWN LINEACTIVE2 WeeksMWRA Resurfacing Project
DorchesterALBION STDUDLEY STCLIFTON STTBD2 Weeks 
DorchesterALEXANDER STDUDLEY STOLEANDER STTBD2 Weeks 
DorchesterALEXANDER STOLEANDER STBIRD ST WTBD2 Weeks Utility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
DorchesterASHMONT STADAMS STFREEPORT STTBD2 Weeks 
DorchesterBAKER AVQUINCY STBODWELL STTBD2 WeeksNational Grid installed new gas main in 2011/ Paving to take place in spring 2012
DorchesterBIRD ST CEYLON STMAGNOLIA STTBD2 Weeks 
DorchesterBIRD STMONADNOCK STRAIL LINETBD2 Weeks 
DorchesterBRADSHAW STGLENWAY STBICKNELL STTBD2 WeeksNSTAR Electric to install new conduit delaying paving until 2012
DorchesterBROOKVIEW STBLUE HILL AVHARVARD STTBD2 Weeks 
DorchesterBULLARD STBOWDOIN AVROSSETER STTBD2 Weeks 
DorchesterBURRELL STCLIFTON STNORFOLK AVTBD2 Weeks 
DorchesterCARMEN STVASSAR STNORWELL STTBD2 Weeks 
DorchesterCAWFIELD STELDER STEASTMAN STTBD2 Weeks 
DorchesterCENTRE STCENTRE AVDORCHESTER AVTBD2 WeeksNational Grid installed new main in 2011/ Paving will now take place in 2012
DorchesterCHAMPLAIN CIRSCHOOL STDEAD ENDTBD2 Weeks 
DorchesterCHARLOTTE STBLUE HILL AV NBBRADSHAW STTBDTBAReconstruction Project/ Scheduled for 2012
DorchesterCLAYBOURNE STBOWDOIN STPARK STTBDTBAReconstruction Project/ Scheduled for 2012
DorchesterCOLEMAN STHENDRY STQUINCY STTBD2 Weeks 
DorchesterCOLEUS PARKLAWRENCE AVINTERVALE STTBD2 Weeks 
DorchesterCORONA STGENEVA AVBOWDOIN STTBD2 Weeks 
DorchesterDEAN STHOWARD AVJUDSON STTBD2 Weeks 
DorchesterDEERING RDBLUE HILL AV SBHARVARD STTBDTBAReconstruction Project/ Scheduled for 2012
DorchesterEASTMAN STELDER STCOLUMBIA RDTBD2 Weeks 
DorchesterEDISON GREEN NDORCHESTER AVPOND STTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
DorchesterELDER STCOLUMBIA RDHUMPHREYS STTBD2 Weeks 
DorchesterELMHURST STNORFOLK STSOUTHERN AVTBD2 Weeks 
DorchesterEUCLID STWASHINGTON STWITHINGTON STTBD2 Weeks 
DorchesterFENDALE AVWASHINGTON STNEVADA STTBD2 Weeks 
DorchesterFERNBORO ST LAWRENCE AVINTERVALE STTBD2 Weeks 
DorchesterGLENARM STWASHINGTON STSEAVER STTBDTBAReconstruction Project/ Scheduled for 2012
DorchesterGLENROSE RDADAMS ST NST MARKS RDTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
DorchesterGREENOCK STBLUE HILL AV SBHARVARD STTBD2 WeeksCOMPLETED
DorchesterHALF MOON STMAGNOLIA STLINGARD STTBD2 Weeks 
DorchesterHALLET STMINOT STGALLIVAN BLVDTBD2 Weeks 
DorchesterHANSBOROUGH STBLUE HILL AVHARVARD STTBD2 Weeks 
DorchesterHARTFORD STHOWARD STCHAMBLET STTBD2 Weeks 
DorchesterHILLSBORO RDWELLINGTON HILL RDHAZELTON STTBD2 Weeks 
DorchesterHOWARD AVDEWEY STWAYLAND STTBD2 Weeks 
DorchesterHUMPHREYS STEAST COTTAGE STDUDLEY STTBD2 Weeks 
DorchesterJOSEPHINE STGENEVA AVDITSON STTBD2 WeeksCOMPLETED
DorchesterLAWRENCE AVFERNBORO ST MAGNOLIA STTBD2 Weeks 
DorchesterLEEDSVILLE STDORCHESTER AVADAMS STTBD2 Weeks 
DorchesterLEYLAND STEAST COTTAGE STBURGESS STTBD2 Weeks 
DorchesterLINDSEY STWALDECK STGREENBRIER STTBDTBAReconstruction Project/ Scheduled for 2012
DorchesterLINGARD STMAGNOLIA STHARTFORD STTBD2 Weeks 
DorchesterLYNDHURST STALLSTON STWASHINGTON STTBD2 Weeks 
DorchesterMAGNOLIA STDUDLEY STQUINCY STTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
DorchesterMATHER STDORCHESTER AVNIXON STTBD2 Weeks 
DorchesterMAYFIELD STDORCHESTER AVBAKERSFIELD STTBD2 Weeks 
DorchesterMILLS STROCKLAND STDALE STTBD2 Weeks 
DorchesterMOUNTAIN AVWOODROW AVBALLOU AVTBDTBAReconstruction Project/ Scheduled for 2012
DorchesterNAHANT STADAMS STNEWHALL STTBD2 Weeks 
DorchesterOLDFIELDS RDCOLUMBIA RDDEAD ENDTBD2 Weeks 
DorchesterOWENCROFT RDGALLIVAN BLVDCROFTLAND STTBD2 Weeks 
DorchesterPERTH STFAYSTON STQUINCY STTBD2 Weeks 
DorchesterPOWELLTON RDCOLUMBIA RD NBGLENARM STTBDTBAReconstruction Project/ Scheduled for 2012
DorchesterRHOADES STBLUE HILL AV SBMORTON STTBD2 Weeks 
DorchesterRICHMOND STWASHINGTON STDORCHESTER AVTBD2 Weeks 
DorchesterRINGGOLD STHANSON STWALTHAM STTBD2 Weeks 
DorchesterRIVER STWASHINGTON STOLD MORTON STMAY2 WeeksUNDER CONSTRUCTION/ MWRA Paving project
DorchesterROMSEY STDORCHESTER AVSYDNEY STTBD2 Weeks 
DorchesterROXTON STGLENWAY STGREENWOOD STTBD2 Weeks 
DorchesterRUXTON RDRUGBY RDRIDLON RDTBD2 Weeks 
DorchesterSARGENT STHOWARD AVHARTFORD STTBD2 WeeksNational Grid installed new main in 2011/ Paving will now take place in Spring of 2012
DorchesterSEDALIA RDELMER RDBEAUMONT STTBD2 Weeks 
DorchesterSPENCER STHARVARD ST ATHELWOLD STTBD2 Weeks 
DorchesterSPENCER STWHEATLAND STTALBOT AVTBD2 Weeks 
DorchesterST MARKS RDFLORIDA STADAMS ST NTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
DorchesterSTONEHURST STTOPLIFF STHAMILTON STTBD2 Weeks 
DorchesterSUDAN STDORCHESTER AVSYDNEY STTBD2 Weeks 
DorchesterTHANE STPARK STHARVARD STTBD2 Weeks 
DorchesterTHETFORD AVNORFOLK STEVANS STTBD2 Weeks 
DorchesterTUTTLE STSAVIN HILL AVHARTLAND STTBD2 Weeks 
DorchesterWASHINGTON STMORTON STDORCHESTER AVMAY2 WeeksUNDER CONSTRUCTION/MWRA Resurfacing Project
DorchesterWENDOVER STDUDLEY STHUMPHREYS STTBD2 Weeks 
DorchesterWESSEX STSHENANDOAH STDEAD ENDTBD2 Weeks 
DorchesterWEST COTTAGE STDUDLEY STBROOK STTBD2 Weeks 
DorchesterWEST SELDEN STMORTON STHENRICI STTBD2 Weeks 
DorchesterWEYANOKE STWESSEX STCARRUTH STTBD2 Weeks 
DorchesterWEYANOKE STCARRUTH STBUSHNELL STTBD2 WeeksNational Grid installed main in 2011/ Delaying paving until 2012
DorchesterWHITFIELD STNORFOLK STSOUTHERN AVTBD2 Weeks 
DorchesterWILCOX RDELMER RDBEAUMONT STTBD2 Weeks 
DorchesterWILLIS STPLEASANT STSUMNER STTBD2 Weeks 
DorchesterWILMINGTON AVMILTON AVNEVADA STTBD2 WeeksNational Grid installed main in 2011/ Delaying paving until Spring 2012
East BostonBENNINGTON STNEPTUNE STSWIFT STTBD2 Weeks 
East BostonBENNINGTON ST WBBREMEN STNEPTUNE RDTBD2 Weeks 
East BostonBROOKS STCHELSEA ST BENNINGTON STTBD2 Weeks 
East BostonCHELSEA STEAST EAGLE STCHELSEA TOWN LINETBDTBAReconstruction Project/ Scheduled for 2012
East BostonCOTTAGE STWEBSTER STGOVE ST ETBD2 WeeksNational Grid installed a new gas main in 2011 / Final Paving delayed until 2012
East BostonFALCON STBORDER STMERIDIAN STTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
East BostonFALCON STMERIDIAN STPUTNAM STTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
East BostonGOVE ST WHAVRE ST SCHELSEA STTBD2 Weeks 
East BostonLEXINGTON STMERIDIAN STMARION STTBD2 Weeks 
East BostonLEXINGTON STBORDERSTMERIDIAN STTBD2 Weeks 
East BostonLEYDEN STBOARDMAN STBREED STTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
East BostonLEYDEN STBREED STBOARDMAN STTBD2 Weeks 
East BostonMARGINAL ST EORLEANS STDEAD ENDTBD2 WeeksNational Grid to install new gas main/ Will delay paving until 2012
East BostonSHELBY STLEXINGTON STSARATOGA STTBD2 Weeks 
East BostonSUMNER STHAVRE ST SORLEANS STTBD2 Weeks 
FenwayBAY STATE RDBEACON STGRANBY ST20132 WeeksMajor construction and utility work will delay paving until 2013
FenwayBEACON STCHARLESGATE WRALEIGH STTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
FenwayBUCKNAN STFISHER AVLAWN STTBD2 Weeks 
FenwayHAVILAND STEDGERLY RDHEMENWAY STTBD2 WeeksMajor developmet work in 2011/ Paving delayed until 2012
FenwayPALACE RDLONGWOOD AVFENWAYTBD2 Weeks 
FenwayPUBLIC ALLEY 809GAINSBOROUGH STSYMPHONY STTBD2 Weeks 
FenwayPUBLIC ALLEY 811GAINSBOROUGH STSYMPHONY STTBD2 Weeks 
FenwayQUEENSBERRY STJERSEY STPARK DRTBD2 Weeks 
FenwayST ALBANS RDHUNTINGTON AVFRANCIS STTBD2 Weeks 
FenwayUNIVERSITY RDCOMMONWEALTH AV EBJAMES J STORROW DRTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
Hyde ParkALWIN STSTONEHILL CIRDEDHAM TOWN LINEMAY2 WeeksCOMPLETED
Hyde ParkANDRIA RDGEORGE STDEAD ENDTBD2 Weeks 
Hyde ParkBUSINESS STRIVER STRIVER STTBD2 WeeksMajor BWSC work in 2011 delayed paving until 2012
Hyde ParkEVERETT STCENTRAL AVHYDE PARK AVTBD2 WeeksNSTAR Gas to install new gas main/ Will delay paving until 2012
Hyde ParkFARADAY STTRUMAN PKWY NBWASHINGTON STTBD2 WeeksNSTAR Gas installed new gas main in 2011/ Street will be paved in 2012
Hyde ParkFARRAR AVTACOMA STWOOD AVMAY2 WeeksCOMPLETED
Hyde ParkGARFIELD AVTRUMAN PKWY NBWASHINGTON STTBD2 WeeksNSTAR Gas installed new gas main in 2011/ Street will be paved in 2012
Hyde ParkHOLMFIELD AVRIVER STDEAD ENDMAY2 WeeksCOMPLETED
Hyde ParkJOYCE RDWOOD AVGEORGE STMAY2 WeeksCOMPLETED
Hyde ParkLOCHLAND RDMILTON AVSUMMIT STMAY2 Weeks 
Hyde ParkMILLSTONE STHYDE PARK AVECOLCHESTER STTBD2 Weeks 
Hyde ParkPARK STWESTMINSTER STARLINGTON STMAY2 WeeksCOMPLETED
Hyde ParkPINGREE STHYDE PARK AVDANA AVTBD2 WeeksNSTAR Gas to install new gas main in 2012/ Paving will take place Fall 2012
Hyde ParkPRESCOTT STHYDE PARK AVDEAD ENDMAY2 WeeksCOMPLETED
Hyde ParkREADVILLE STCOMO RDWEST MILTON STTBD2 WeeksNSTAR Gas installed new gas main in 2011/ Street will be paved in 2012
Hyde ParkREYNOLD RDCHESTERFIELD STCOMO RDTBD2 Weeks 
Hyde ParkRIVER STGORDON AVRESERVATION RDTBDTBAReconstruction Project/ Scheduled for 2012
Hyde ParkRIVER STRESERVATION RDTURTLE POND PARKWAYTBD2 Weeks 
Hyde ParkROSEGLEN RDBIRCHCROFT RDDEAD ENDTBD2 WeeksNSTAR Gas to install new gas main in 2012/ Paving will take place Fall 2012
Hyde ParkSTANBRO STCOLCHESTER STHYDE PARK AVTBD2 Weeks 
Hyde ParkWASHINGTON STCHITTICK RDNEEDHAM RDTBD2 Weeks 
Hyde ParkWASHINGTON STGARFIELD AVCHITTICK RDTBD2 WeeksNSTAR Gas installed new gas main in 2011/ Street will be paved in 2012
Hyde ParkWATERLOO STREADVILLE STNEPONSET VALLEY PKWY NAPRIL2 WeeksCOMPLETED
Hyde ParkWINDHAM RDDALE STAUSTIN STMAY2 WeeksCOMPLETED
Jamaica PlainBALLARD STCENTRE STCUSTER STTBD2 WeeksUtility work in 2011 delayed Final paving until 2012
Jamaica PlainCALL STEVERETT STMCBRIDE STTBD2 Weeks 
Jamaica PlainCHESTNUT AVBOYLSTON STSHERIDAN STTBD2 Weeks 
Jamaica PlainELDRIDGE STHYDE PARK AVPATTEN STTBD2 Weeks 
Jamaica PlainELM STGREEN STSEAVERNS AVTBD2 Weeks 
Jamaica PlainELWELL RDALLANDALE STDEAD ENDAPRIL2 WeeksCOMPLETED
Jamaica PlainEVERGREEN STDAY STSOUTH HUNTINGTON AVTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
Jamaica PlainGLEN RDWASHINGTON STFOREST HILLS STTBD2 Weeks 
Jamaica PlainGROVENOR RDCENTRE STPOND ST ETBD2 Weeks 
Jamaica PlainGROVENOR RDPOND STCENTRE STTBD2 Weeks 
Jamaica PlainHOLBROOK STCENTRE STDANE STTBD2 Weeks 
Jamaica PlainMORAINE STCENTRE STJAMAICAWAYTBD2 Weeks 
Jamaica PlainNEWBERN STBISHOP STCAROLINA AVTBD2 WeeksNew Gas Main will delay paving until 2012
Jamaica PlainORGAN PARK STDEAD ENDCATHERINE STAPRIL2 WeeksCOMPLETED
Jamaica PlainPOND CIRPOND ST WPOND ST WTBD2 WeeksNational Grid installed a new gas main in 2011 / Final Paving delayed until 2012
Jamaica PlainPOND VIEW AVPERKINS STPERSHING RDTBD2 Weeks 
Jamaica PlainSEDGWICK STELM STJOHN A ANDREW STTBD2 Weeks 
MattapanANDRIA RDGEORGE STDEAD ENDMAY2 WeeksCOMPLETED
MattapanCLEARWATER DRMORTON STMARYKNOLL STTBD2 Weeks 
MattapanCOURTLAND RDMORTON STHARVARD STTBD2 Weeks 
MattapanFAIRWAY STCUMMINS HWY NBBLUE HILL AV SBTBDTBAReconstruction Project/ Scheduled for 2012
MattapanHARVARD STWALKHILL STCUMMINGS HWYAPRIL2 WeeksCOMPLETED
MattapanHIAWATHA RDBLUE HILL AV SBFOTTLER RDTBDTBAReconstruction Project/ Scheduled for 2012
MattapanHOLLINGSWORTH STCUMMINS HWYDEAD ENDTBD2 Weeks 
MattapanITASCA STALMONT STCUMMINS HWYTBD2 Weeks 
MattapanJOYCE RDWOOD AVGEORGE STMAY2 WeeksCOMPLETED
MattapanLINDVALE TERMAMELON CIRGLADESIDE AVTBD2 Weeks 
MattapanLORNA RDMORTON STDOONE AVTBD2 Weeks 
MattapanMAMELON CIRRIVER STRIVER STTBD2 Weeks 
MattapanMASSASOIT STRIVER STDEAD ENDAPRIL2 WeeksCOMPLETED
MattapanORMOND STOUTLOOK RDWELLINGTON HILL STTBD2 Weeks 
MattapanPOYDRAS STRIVER STDEAD ENDTBD2 Weeks 
MattapanREXFORD STBLUE HILL AV SBCUMMINS HWY NBTBDTBAReconstruction Project/ Scheduled for 2012
MattapanRIDGEVIEW AVRIVER STDEAD ENDTBD2 Weeks 
MattapanRIVER STCUMMINS HWYWACHUSETT STApril- November6 MONTHS UNDER CONSTRUCTION/ Sidewalk and traffic improvements to start in Fall 2011/ Roadway to be completed in 2012
MattapanVERRILL STMORTON STWOOLSON STTBDTBAReconstruction Project/ Scheduled for 2012
MattapanWILDWOOD STMORTON STMIDDLETON STTBD2 Weeks 
Mission HillLAWN STESTEY STBUCKNAN STTBD2 Weeks 
Mission HillSACHEM STCALUMET STHILLSIDE STMAY2 WeeksCOMPLETED
Mission HillST ALPHONSUS STLONGWOOD AVSMITH STTBD2 Weeks 
North EndBATTERY STHANOVER STCOMMERCIAL STTBD2 Weeks 
North EndRICHMOND STNORTH STHANOVER ST NTBD2 Weeks2011 Utility work delayed Final Paving until 2012
North EndSALEM STCROSS STCHARTER STOctober2 WeeksNSTAR Electric to complete work by June - Paving in Fall
RoslindaleBEECHLAND STWASHINGTON STBERAM AVTBDTBAReconstruction Project/ Scheduled for 2012
RoslindaleCUMMINS HWYWASHINGTON STHARDING RDTBDTBAReconstruction Project/ Scheduled for 2012
RoslindaleCUMMINS HWYWASHINGTON STHARDING RDApril- November6 Months UNDER CONSTRUCTION/Reconstruction project/ Scheduled to start Spring 2012
RoslindaleHASLET STROSLINDALE AVMETCALF STTBD2 Weeks 
RoslindaleHILLVIEW AVWHITFORD STCRANDALL STTBD2 Weeks 
RoslindaleMETROPOLITIAN AVAUGUSTUS AVPOPLAR STMAY2 Weeks 
RoslindalePENFIELD STMETCALF STBIRCH STTBD2 Weeks 
RoxburyALBION STDUDLEY STCLIFTON STTBD2 Weeks 
RoxburyCABOT STRUGGLES STWHITTIER STTBD2 Weeks 
RoxburyCLEVELAND STWINTHROP STMORELAND STTBD2 Weeks 
RoxburyCOBDEN STWALNUT AVWASHINGTON STTBD2 WeeksTrench repair to be completed in October or November. Depending on the weather conditions the street will be resurfaced in late fall or early next spring. Will update status later this fall.
RoxburyCRAWFORD STWARREN AVHUMBOLDT AVTBD2 Weeks 
RoxburyDALE STWALNUT AVWASHINGTON STTBD2 Weeks 
RoxburyDEWITT DRKERR PLSHAWMUT AVTBA2 Weeks2011 Utility work will delay paving until 2012
RoxburyGREENWICH CTGREENWICH STDEAD ENDMay-August4 Months UNDER CONSTRUCTION/Reconstruction Project/ Scheduled for 2012
RoxburyGREENWICH STWESTMINSTER STWARWICK STMay-August4 MonthsUNDER CONSTRUCTION/Reconstruction Project/ Scheduled for 2012
RoxburyHAMMOND STSHAWMUT AVTREMONT STMay-August4 MonthsUNDER CONSTRUCTION/Reconstruction Project/ Scheduled for 2012
RoxburyHAROLD STCRAWFORD STSEAVER STTBD2 Weeks 
RoxburyHAROLD STHOLWORTHY STTOWNSEND STTBD2 Weeks 
RoxburyHOWLAND STHUMBOLDT AVHAROLD ST STBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
RoxburyHOWLAND STWARREN STELM HILL STTBD2 Weeks 
RoxburyHUTCHINGS STELM HILL AVHAROLD STTBD2 Weeks 
RoxburyLENOX STWASHINGTON STTREMONT STTBD2 Weeks 
RoxburyLINWOOD SQLINWOOD STHIGHLAND AVTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
RoxburyLINWOOD STHIGHLAND STCENTRE STTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
RoxburyMARBURY TERAMORY STDEAD ENDTBD2 WeeksCOMPLETED
RoxburyNEW MARKET SQ ESOUTHAMPTON STNEW MARKET SQ WTBDTBAReconstruction Project/ Scheduled for 2012
RoxburyNEW MARKET SQ WMASSACHUSETTS AVNEW MARKET SQ NTBDTBAReconstruction Project/ Scheduled for 2012
RoxburyOTISFIELD STGASTON STBLUE HILL AVTBD2 Weeks 
RoxburyROXBURY STCENTRE STELMWOOD STTBD2 Weeks 
RoxburyRUTHVEN STELM HILL AVHAROLD STTBD2 Weeks 
RoxburyRUTHVEN STHAROLD STWALNUT AVTBD2 Weeks 
RoxburySUSSEX STHAMMOND STWARWICK STMay-August4 MonthsUNDER CONSTRUCTION /Reconstruction Project/ Scheduled for 2012
RoxburyWARWICK STHAMMOND STWINDSOR STMay-August4 MonthsUNDER CONSTRUCTIONReconstruction Project/ Scheduled for 2012
RoxburyWESTMINSTER STHAMMOND STGREENWICH STMay-August4 MonthsACTIVE RECONSTRUCTION/Reconstruction Project/ Scheduled for 2012
RoxburyWHITING STWARREN STMORELAND STTBD2 Weeks 
RoxburyWINDSOR STSHAWMUT AVWARWICK STMay-August4 Months UNDER CONSTRUCTION/Reconstruction Project
South BostonA STNECCO STCONGRESS STTBA2 Weeks2011 BRA project, on hold until 2012
South BostonBOWEN STD STE STTBA2 WeeksNational Grid to install new main 2012/ Street on hold till after completion of work
South BostonBOWEN STF STDORCHESTER STTBA2 WeeksNational Grid to install new main 2012/ Street on hold till after completion of work
South BostonBREWSTER STEAST SEVENTH STEAST EIGHTH STTBD2 WeeksNational Grid installed new gas main in 2011/ Delayed paving until 2012
South BostonDEVINE WAYOLD COLONY AVDORCHESTER AVJUNE2 Weeks 
South BostonGAVIN WAYO'CALLAHAN WAYLOGAN WAYJUNE2 Weeks 
South BostonO'CONNER WAYDORCHESTER AVKEMP STJUNE2 Weeks 
South BostonSILVER STG STDORCHESTER STTBD2 Weeks 
South BostonSPRINGER STEAST EIGHTH STEAST SEVENTH STTBD2 WeeksNational Grid installed new gas main in 2011/ Delayed paving until 2012
South BostonWEST EIGHTH STD STE STTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
South EndAPPLETON STTREMONT STDARTMOUTH STTBD2 Weeks 
South EndCLARENDON STTREMONT STCOLUMBUS AV NTBD2 Weeks 
South EndDWIGHT STSHAWMUT AVTREMONT STTBD2 Weeks 
South EndDWIGHT STSHAWMUT AVTREMONT STTBD2 Weeks 
South EndEAST SPRINGFIELD STWASHINGTON STHARRISON AVTBD2 WeeksUtility work in 2011 delayed paving until 2012
South EndGREENWICH PKCOLUMBUS AV NCLAREMONT STJULY2 Weeks 
South EndHARRISON AVMASSACHUSETTS AVEAST LENOX STTBD2 Weeks 
South EndPAUL PLSHAWMUT AVHERALD STTBD2 Weeks 
South EndPUBLIC ALLEY 810PUBLIC ALLEY 809PUBLIC ALLEY 811TBD2 Weeks 
South EndSHAWMUT STPIEDMONT STCHURCH STTBD2 Weeks 
South EndST GEORGE STEAST BROOKLINE STEAST NEWTON STTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
South EndUNION PARK STWASHINGTON STHARRISON AVTBD2 WeeksNational Grid installed new gas main in 2011/ Delaying paving until 2012
South EndUPTON STTREMONT STSHAWMUT AVTBD2 Weeks 
South EndWEST CONCORD STSHAWMUT AVTREMONT STTBD2 WeeksUtility Trench permanently repaired in Fall/ Final Paving scheduled for Spring 2012
South EndWEST RUTLAND SQCOLUMBUS AVDEAD ENDTBD2 Weeks 
West RoxburyANAWAN TERANAWAN AVDEAD ENDTBD2 Weeks 
West RoxburyASHFIELD STWALTER STFAIRVIEW STTBD2 Weeks 
West RoxburyCHISHOLM RDPOPLAR STCORNELL STMAY2 Weeks 
West RoxburyCHISHOLM TERCHISHOLM RDDEAD ENDMAY2 Weeks 
West RoxburyCRANDALL STAUGUSTUS AVHILLVIEW STTBD2 Weeks 
West RoxburyFARMINGTON RDVFW PARKWAYWESTOVER STTBD2 Weeks 
West RoxburyGLENDOWER RDPOPLAR STKITTREDGE STMAY2 Weeks 
West RoxburyGRAHAM TERMAPLE STDEAD ENDTBD2 Weeks 
West RoxburyGRAYFIELD AVCOREY STHOUSTON STTBD2 Weeks 
West RoxburyHEATHCOTE STPOPLAR STHAWTHORNE STMAY2 Weeks 
West RoxburyHOUSTON STMONTVIEW STGRAYFIELD AVTBD2 Weeks 
West RoxburyKNOLL STWALTER STCENTRE STTBD2 WeeksNational Grid installed new gas main in 2011/ Will delay paving until 2012
West RoxburyMANTHORNE RDCENTRE STWELD STTBD2 Weeks 
West RoxburyMAPLE STCENTRE STGARTH RDTBD2 Weeks 
West RoxburyORIOLE STPARK STWREN STTBDTBAReconstruction Project/ Scheduled for 2012
West RoxburyTENNYSON STBELLEVUE STWOODARD RDTBDTBAReconstruction Project/ Scheduled for 2012
West RoxburyWILLOWDEAN AVPARKLAWN RDCOURTNEY RDTBD2 Weeks 
West RoxburyWOODARD RDWREN STBELLEVUE STTBDTBAReconstruction Project/ Scheduled for 2012
West RoxburyYORKTOWN STLA GRANGE STPOTOMAC STTBD2 Weeks 
       
 