You can find a working list of streets below that the City of Boston plans on resurfacing or reconstructing during the 2018 construction season. This list is subject to change and may be altered to accommodate necessary underground infrastructure improvements or other unforeseen circumstances.

If you live on a street that is proposed for resurfacing or reconstruction and are thinking about installing a new service or upgrading a current service for your building, it is critical that you refer to our utilities fact sheet

Any delay may result in the street being paved and your ability to receive a permit for a service connection denied.

We created a page to explain the resurfacing process in more detail. If you have any questions, please contact the Construction Management division of Public Works at 617-635-4950.


Search By:     Or By:
NeighborhoodStreetFrom StreetTo StreetWork TypeEstimated StartDurationStatusCompleted
Allston/BrightonADAIR STFANEUIL STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonBEACON STAYR RDCHESTNUT HILL AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonBIGELOW STJUSTIN RDBROOKS STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED/ON HOLD…CURRENTYCOORDINATING UTILITY WORK TO BE DONE BEFORE WE PAVE 
Allston/BrightonBLAINE STBRAINTREE STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonBRIGHTON AV@CHESTER ST@CHESTER STSidewalk ReconstructionMAY- JULY3 MONTHSACTIVE 
Allston/BrightonCHARLESVIEW STBIGELOW STNEWTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonCHESTNUT HILL AVBEACON STCOMMONWEALTH AVFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
Allston/BrightonCHESTNUT HILL AV@ WINSHIP STNASidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
Allston/BrightonCOMMONWEALTH AV EBESSEX STNAPLES STMassDOT ReconstructionNOVEMBER 2017 -NOVEMBER 20181 YEARACTIVE/MASSDOT RECON /NEWPORT CONTRACTOR 
Allston/BrightonCOMMONWEALTH AV WBUNIVERSITY RDALCORN STMassDOT ReconstructionNOVEMBER 2017 - NOVEMBER 20181 YEARACTIVE/MASSDOT RECON /NEWPORT CONTRACTOR 
Allston/BrightonCUSHMAN RDGLENCOE STDUSTIN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonDICKINSON RDWASHINGTON STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonFISKE TERBRAINERD RDBROOKLINE TOWN LINECapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonGREYMERE RDWASHINGTON ST BRDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonHASKELL STHOOKER STCOOLIDGE RD BRAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonHIGH ROCK WAYIMRIE RDGORDON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonLAROSE PLMONASTERY RDDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonMALBERT RDWASHINTON ST BRDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonMT VERNON ST BRACADEMY HILL RD FOSTER ST BRFull ReconstructionTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonNORTH CRESCENT CIRCUITBRECK AVDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonQUINT AVBRIGHTON AV EB LANE (EVEN)GLENVILLE AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonRANSOM RDCLAYMOSS RDCOLBORNE RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonRUSHMORE STACADEMY HILL RDMICHAEL RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonSNOW STWASHINGTON STUNION STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonST LUKES RDBRIGHTON AV EB LANE (EVEN)SERVICE RD (OFF COMM AV WB)Asphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonWILSHIRE RDCHESTNUT HILL AVDEAD ENDAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
Allston/BrightonWM JACKSON AVCHESTNUT HILL AVDEAD ENDAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
Allston/BrightonWOODMONT STBROOKS ST BRDEAD ENDAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
Back BayARLINGTON STISABELA STMELROSE STFull ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
Back BayBOYLSTON STEXETER STFAIRFIELD STSidewalk ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
Back BayPUBLIC ALLEY 424CLARENDON STDARTMOUTH STAsphalt ResurfacingTBD1 WEEKNOT STARTED 
Back BayPUBLIC ALLEY 434PUBLIC ALLEY 435PUBLIC ALLEY 433Asphalt ResurfacingTBD2 WEEKSNOT STARTED  
Back BayPUBLIC ALLEY 437ARLINGTON ST BERKELEY STAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
Back BayPUBLIC ALLEY 439CLARENDON STDARTMOUTH STAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
Beacon HillBEACON STTREMONT STPARK STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Beacon HillBEACON STPARK STARLINGTON ST BPAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Beacon HillBRANCH STSPRUCE STCLARLES STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Beacon HillWALNUT STBEACON STMT VERNON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Boston ProperBATTERYMARCH STWATER STHIGH STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Boston ProperCOURT STAT COURT SQUARE@ COURT SQUARESidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED 
Boston ProperDEVONSHIRE ST@ OLD STATE HOUSE@ OLD STATE HOUSESidewalk ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED  
Boston ProperFRIEND STMARKET STCAUSEWAY ST EB ODDFull ReconstructionTBDTBDNOT STARTED  
Boston ProperNORTH STCONGRESS STUNION STFull ReconstructionNOVEMBER 20181 YEARRECONSTRUCTION/CONNECT HISTORIC BOSTON10/31/18
Boston ProperOLIVER STMILK STHIGH STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Boston ProperSALT LNUNION STSCOTT ALLEYFull ReconstructionNOVEMBER 20181 YEARACTIVE/RECONSTRUCTION/CONNECT HISTORIC BOSTON 
Boston ProperSTATE ST@ KILBY STAT KILBY STSidewalk ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED 
Boston ProperUNION STNORTH STHANOVER STFull ReconstructionNOVEMBER 20181 YEARPAVED/RECONSTRUCTION/CONNECT HISTORIC BOSTON10/11/18
Boston ProperWINTHROP SQUAREAT OTIS ST @DEVONSHIRE STREETSAT OTIS @ DEVONSHIRE STREETSSidewalk ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED  
CharlestownBUNKER HILL CTBUNKER HILL STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
CharlestownCEDAR STHIGH STBARTLETT STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
CharlestownCHARBONNIER STMAIN STMAIN STAsphalt ResurfacingTBD2 WEEKSNOT STARTED 
CharlestownCONCORD STMONUMENT SQBUNKER HILL STAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
CharlestownCROSS STHIGH STTRENTON STAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
CharlestownDECATUR STVINE ST MEDFORD STAsphalt ResurfacingTBD2 WEEKSNOT STARTED 
CharlestownFIRST AVFIFTH STTHIRTEENTH STAsphalt ResurfacingTBDTBDNOT STARTED 
CharlestownHENLEY STHARVARD SQWARREN STAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
CharlestownHILL STDEAD ENDCOOK STAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
CharlestownLYNDE STUNION STNEW RUTHERFORD AVAsphalt ResurfacingTBD2 WEEKSNOT STARTED 
CharlestownMONUMENT SQCHESTNUT STCHESTNUT STAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
CharlestownMONUMENT STMONUMENT SQBUNKER HILL STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
CharlestownNEAREN ROWTREMONT STFERRIN STAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
CharlestownNEW RUTHERFORD AVRUTHERFORD AVMISHAWUM STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
CharlestownPLEASANT STMAIN STMONUMENT SQAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
CharlestownSEVENTH STTHIRD AVFIRST AVAsphalt ResurfacingTBDTBDNOT STARTED 
CharlestownTREMONT STPROSPECT STLOWNEY WAYAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
CharlestownWALFORD WAYTUFTS STPOLK STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
CharlestownWALFORD WAYDECATUR STSTARR KING CTAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
CharlestownWARREN STHENLY STMONUMENT AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
CharlestownWOOD STMAIN STHIGH STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
ChinatownBEACH STATLANTIC AVSURFACE ROADFull ReconstructionTBD6 MONTHSNOT STARTED 
DorchesterBALINA PLNORFOLK STDEAD ENDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterBRANCHFIELD STMEDWAY STBUTLER STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED/ NEW GAS MAIN THIS SUMMER/ RESURFACE IN FALL 
DorchesterCHURCH STWINTER STFRUEAN PLAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterCONLEY STTENEAN STMORRISSEY BLVDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterDAVITT STSAVIN HILL AVEDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterDORCHESTER AVAT LINDEN STAT LINDEN STSignal Installation WorkTO BE DETERMINED2 MONTHSNOT STARTED 
DorchesterDUNBAR STWASHINGTON STWENTWORTH TERAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterEAST COTTAGE ST HUMPHREYS STNORFOLK AVSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
DorchesterEAST STCHURCH STADAMS STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterEDSON STNORFOLK STMILTON AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterELY RDFREDERIKA STKENMARE RDAsphalt ResurfacingTBDTBDNOT STARTED 
DorchesterEUCLID STWASHINGTON STWITHINGTON STSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED/ON HOLD…CURRENTYCOORDINATING UTILITY WORK TO BE DONE BEFORE WE PAVE 
DorchesterFAIRMOUNT STMILTON AVMORTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterFRANCONIA STADAMS STCHARLEMONT STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterGENE STHUMPHREYS STBELDEN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterGENEVA AVAT CHARLES AND WALDECK STREETSAT CHARLES AND WALDECK STREETSSignal Installation WorkTO BE DETERMINED2 MONTHSNOT STARTED 
DorchesterHOWARD AVEDUDLEY STHARTFORD STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
DorchesterHUMPHREYS PLHUMPHREYS STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterIRMA STCALLENDER STWOODROW AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterJOANNE TERADAMS STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterKANE STBELLEVUE STSTANLEY STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
DorchesterKINGSDALE STSTANDISH STBERNARD STAsphalt ResurfacingNOVEMBER2 WEEKSACTIVE 
DorchesterMT EVERETT STQUINCY STHAMILTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
DorchesterNEW ENGLAND AVTALBOT AVWOODROW AVFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED  
DorchesterOAKTON AVADAMS STPIERCE AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterODONNELL TERCENTRE STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterOGDEN STFAIRMOUNT STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterOLD MORTON STPLEASANT HILL AVSANFORD STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterOLD RDMICHIGAN AVCOLUMBIA RDSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
DorchesterPARK STADAMS STFREEPORT STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED/ACTIVE NEW GAS MAIN WORK/RESURFACING IN FALL 
DorchesterQUINCEFIELD STHUMPHREYS STWENDOVER STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
DorchesterQUINCY STBLUE HILL AV COLUMBIA RDFull ReconstructionMAY- SEPTEMBER5 MONTHSACTIVE 
DorchesterRICHFIELD STHAMILTON STOLNEY STAsphalt ResurfacingTBDTBDNOT STARTED 
DorchesterRIPLEY RDHARVARD STCARMEN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterSAVIN HILL AVDORCHESTER AVHUBBARDSTON RDCapital Resurfacing20182 WEEKSNOT STARTED/ ACTIVE UTILITY WORK MAY DELAY PAVING UNTIL 2019 
DorchesterTUPELO STSAVIN STQUINCY PLAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterWOLCOTT STCOLUMBIA RDERIE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterWYOLA STCOLUMBIA RDSUSI YARDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonBAYSWATER STSARATOGA STST ANDREW RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonCHELSEA STMAVERICK STGEORGE R VISCONTI RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonCOWPER STMOORE STBYRON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonCOWPER STBYRON STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonCURTIS STCHELSEA STCURTIS STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonFAYWOOD STCRESTWAY RDORIENT AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonFRANKFORT STNEPTUNE RDDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonGEORGE R VISCONTI RDCHELSEA STPARIS STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonHAVRE STGEORGE R VISCONTI RDMARION STAsphalt ResurfacingTBDTBDNOT STARTED 
East BostonHORACE STHARMONY STBYRON STAsphalt ResurfacingTBDTBDNOT STARTED 
East BostonJEFFRIES STMAVERICK STSUMNER STAsphalt ResurfacingTBDTBDNOT STARTED 
East BostonMERIDIAN STLONDON STLONDON STSignal Installation WorkTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonPARIS STSUMNER STMERIDIAN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonPRESCOTT STEAST EAGLE STBREMEN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonSARATOGA STTRIDENT STBURGER KING DRIVEWAYSidewalk ReconstructionTO BE DETERMINED2 WEEKSSIDEWALK RECON 
East BostonTRIDENT STSARATOGA STBENNINGTON STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED RECON/ADVERTISE IN FALL/ LIKELY START IN 2019 
East BostonWORDSWORTH STCHARLES ERNEST ANDREW FbCOLERIDGE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
FenwayBINNEY STFRANCIS STCHILDRENS RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
FenwayBROOKLINE AVFENWAY BROOKLINE TOWN LINEAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED/ COORDINATING UTILITY WORK FIRST/ LIKELY HOLDING OFF PAVING UNTIL THE FALL OR 2019 
FenwayBURBANK STEDGERLY RDHEMENWAY STCapital ResurfacingTO BE DETERMINEDTBDNOT STARTED/ACTIVE BUILDING WORK WILL HOLD OFF PAVING UNTIL THE FALL OR 2019 
FenwayMEDFIELD STPARK DRBROOKLINE TOWN LINEAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
FenwayST BOTOLPH STMASS AVGAINSBOROUGH STMassDOT ReconstructionJULY2 MONTHSACTIVE 
Hyde ParkCENTRAL AVARLINGTON STGREENWOOD AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Hyde ParkERNEST AVWEST MILTON STRIVER STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED / ON HOLD TILL FALL FOR NEW GAS MAIN WORK 
Hyde ParkHUNTINGTON AVTHATCHER STRIVER STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Hyde ParkHYDE PARK AV AT DANA AVAT DANA AVSignal Installation WorkTO BE DETERMINED2 MONTHSNOT STARTED 
Hyde ParkHYDE PARK AVAT MILTON STAT MILTON STSignal Installation WorkTO BE DETERMINED3 MONTHSNOT STARTED 
Hyde ParkHYDE PARK AV MILTON STWOLCOT SQUARESidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED 
Hyde ParkMEADOWVIEW RDSTANBORO STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Hyde ParkMILTON STNEPONSET VALLEY PKWYSPRAUGUE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Hyde ParkMILTON STAT NEPONSET VALLEY PKWYAT NEPONSET VALLEY PKWYSignal Installation WorkTO BE DETERMINED2 MONTHSNOT STARTED  
Hyde ParkNEPONSET VALLEY PKWYAT WOLCOTT SQAT WOLCOTT SQSignal Installation WorkTO BE DETERMINED2 MONTHSNOT STARTED  
Hyde ParkRESERVATION ROADHYDE PARK AVWINTER STSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
Hyde ParkSTURBRIDGE STRIVER STSANFORD STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Hyde ParkTHATCHER STHUNTINGTON AVMETROPOLITAN AVSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
Hyde ParkWESTMINISTER STPROVIDENCE STWESTMINISTER STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Hyde ParkWINTER STGLENWOOD STRRESERVATION RDFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
Jamaica PlainBEECHER STPAUL GORE STBOYLSTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainCANTERBURY STMT HOPE STAMERICAN LEG HWY NB LANE (EVEN)Asphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainMCBRIDE STSOUTH STLEE STSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
Jamaica PlainPERKINS STPRINCE STBROOKLINE TOWN LINEAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainPRINCE STPOND ST (80-460)PERKINS STAsphalt Resurfacing2 WEEKS2 WEEKSNOT STARTED 
Jamaica PlainROBINWOOD AVE (1-85)ROBINWOOD AVE(86-110)ENFIELD STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainSOUTH STARBORWAYBUSSEY STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanLEDGEBROOK RDRIVER STMEADOWBANK AVFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
MattapanLEEHAVEN RDRIVER STMEADOWBANK AVFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
MattapanMEADOWBANK AVRIVER STDEAD ENDFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
MattapanNEWCROFT CIRCLERIVER STRIVER STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
MattapanRIVER STAT EDGEWATER DRIVEAT EDGEWATER DRIVEIntersection Only WorkJUNE-JULY2 MONTHSNOT STARTED 
MattapanSOUTHMERE RDRIVER STLEDGEBROOK RDFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
MattapanWINSTON RDWILLOWWOOD STFRONTENAC STAsphalt ResurfacingAUGUST- SEPTEMBER2 WEEKSNOT STARTED 
North EndHANOVER STCROSS STCOMMERCIAL STAsphalt ResurfacingSEPTEMBER2 WEEKSNOT STARTED/CURRENTLY ALLOWING UTILIY FIBER AND SERVICE CONNECTIONS TO BE DONE OVER THE SUMMER/ PAVING IN SEPTEMBER 
North EndLA FAYETTE AVENDICOTT STPRINCE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndMICHELANGELO STDILLAWAY PLDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndMOON STNORTH SQUARE LEWIS STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED  
North EndNORTH SQPRINCE STMOON STFull ReconstructionJUNE THROUGH NOVEMBER6 MONTHSACTIVE 
North EndNORTH STCLARK STCOMMERCIAL STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndWIGET STSALEM STNORTH MARGIN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoslindaleAMHERST STBELGRADE AVPENFIELD STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoslindaleBIRCH STCORINTH STDURNELL STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
RoslindaleCANTERBURY STBOURNE STNEPONSET AVSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
RoslindaleCOHASSETT STCORINTH STALBANO STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoslindaleKITTERDGE STAT WHITFORD STAT WHITFORD STSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
RoslindaleMETCALF STPENFIELD STDURNELL AVEAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoslindaleSOUTH STAT BUSSEY STAT BUSSEY STSidewalk ReconstructionJULY- OCTOBER4 MONTHSNOT STARTED 
RoxburyALLERTON STGERARD STPIERSON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyBETHUNE WAYZEIGLER STEUSTIS STAsphalt ResurfacingTBDTBDNOT STARTED 
RoxburyBROOK MARSHALL RDRUGGLES STSOJOURNER TRUTH CTFull ReconstructionMAY-AUGUST4 MONTHSACTIVE 
RoxburyCAMDEN STCOLUMBUS AVENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
RoxburyCEDAR STCOLUMBUS AVTERRACE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyCRAWFORD STAT HOLLANDER STAT HOLLANDER STSidewalk ReconstructionAUGUST-SEPTEMBER1 MONTHNOT STARTED 
RoxburyDECKARD STHUMBOLT AVWARREN STSidewalk ReconstructionAUGUST-SEPTEMBER1 MONTHNOT STARTED 
RoxburyDUBOIS STORCHARD PK STADAMS STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyDUDLEY STMAGAZINE STEAST COTTAGE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED/DEVELOPMENT AND UTILITY WORK MAY DELAY UNTIL 2019 
RoxburyDUDLEY STWARREN STWINSLOW STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED/DEVELOPMENT AND UTILITY WORK MAY DELAY UNTIL 2019 
RoxburyEAST LENOX STHARRISON AVWASHINGTON STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED 
RoxburyHARRISHOF STWALNUT AVHUMBOLT AVSidewalk ReconstructionAUGUST-SEPTEMBER1 MONTHNOT STARTED 
RoxburyHARRISON AVMELNEA CASS BLVDEAST LENOX STSidewalk ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
RoxburyHOMESTEAD STWALNUT AVELM HILL AVSidewalk ReconstructionAUGUST-SEPTEMBER1 MONTHNOT STARTED 
RoxburyHUMBOLT AVSEAVER STMALCOM X BLVDSidewalk ReconstructionAUGUST-SEPTEMBER1 MONTHNOT STARTED 
RoxburyJUNIPER TERJUNIPER STWASHINGTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyMALCOM X BLVDAT KING STAT KING STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED 
RoxburyMT PLEASANT AVDUDLEY STDUDLEY STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyNEWCOMB STHARRISON AVWASHINGTON STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
RoxburyREED STEAST LENOX STENDFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
RoxburyRITCHIE STCOLUMBUS AVMARCELLA STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
RoxburyRUGGLES ST ESHAWMUT AVTREMONT STFull ReconstructionTBD4 MONTHSNOT STARTED 
RoxburySHAWMUT AVMELNEA CASS BLVDMADISON PARK CTSidewalk ReconstructionAUGUST -OCTOBER3 MONTHSNOT STARTED 1 SIDE 
RoxburyTHORNDIKE STHARRISON AVWASHINGTON STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
RoxburyWAKULLAH STROCKLAND STDALE STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyWALNUT AVHOLWORTHY STCOBDEN STSidewalk ReconstructionAUGUST-SEPTEMBER1 MONTHNOT STARTED 
South BostonA.VARIOUSA.VARIOUSA.VARIOUSOtherMAY1 MONTHACTIVE/ PATCH PAVING OF PREVIOUS UTILITY CUTS ON VARIOUS SOUTH BOSTON STREETS/ PHASE 1. SAW CUT PATCHES./PHASE 2 DIG LEAVE DOWN 1.5" IN BINDER / PHASE 3. TOP WITHIN 3 DAYS 
South BostonDRESSER STE STDORCHESTER STCapital ResurfacingTO2 WEEKSNOT STARTED 
South BostonEAST SECOND STH STK STAsphalt ResurfacingAUGUST-SEPTEMBER2 WEEKSNOT STARTED/ PAVING BY EVERSOURCE  
South BostonEMERSON STL STM STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonG STDORCHESTER STEAST BROADWAYAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonH STCOLUMBIA RDEAST SECOND STAsphalt ResurfacingSEPTEMBER2 WEEKSNOT STARTED/ PAVING BY EVERSOURCE  
South BostonJAY STEAST FIFTH STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonN STEAST SECOND STEAST BROADWAYAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonSANGER STEAST SEVENTH STEAST EIGHTH STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonSUMMER STEAST SEVENTH STEAST EIGHTH STSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
South BostonSUMMER STMELCHER STWEST SERVICE RDFull ReconstructionAPRIL- JULY4 MONTHSACTIVE  
South BostonVICKSBURG STEAST FIRST STEAST SECOND STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonWEST NINTH STD STE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonWEST SECOND STA STB STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
South EndBERKELEY STTREMONT STCOLUMBUS AVFull ReconstructionJUNE - NOVEMBER5 MONTHSACTIVE / WAITING FOR UTILITY WORK TO BE DONE BEFORE PAVING 
South EndDEACON STWORCESTER STWEST CONCORD STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South EndEAST BERKELEY STTREMONT STCOLUMBUS AVFull ReconstructionAUGUST 2016JULYRECONSTRUCTION/ACTIVE 
South EndHARRISON AVHERALD STEAST BERKELEY STSidewalk ReconstructionTO BE DETERMINEDTO BE DETERMINEDNOT START  
South EndMARGINAL RDSHAWMUT AVARLINGTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South EndPAUL PLACESHAWMUT AVHERALD STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
South EndPAUL SULLIVAN WAYHARRISON AVALBANY STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
South EndRUTLAND STSHAWMUT AVRUTLAND SQCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South EndWEST SPRINGFIELD STTREMONT STCOLUMBUS AVAsphalt ResurfacingTBDTBDNOT STARTED 
West RoxburyCHAPIN STMT VERNON STPRESTON RDFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
West RoxburyCOREY STVFW PARKWAYFURBUSH RDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
West RoxburyCROSSTOWN AVSALMAN STDEDHAM TOWN LINEAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
West RoxburyDUNWELL STBAKER STHELDUN STCapital ResurfacingTBDTBDNOT STARTED 
West RoxburyHEMLOCK RD GOULD STCALEDONIAN AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
West RoxburyJACQUELINE RDANSONIA RDBIRCHLAND AVFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
West RoxburyJESHURUN STGROVE STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
West RoxburyLAGRANGE STAT BELLEVUE HILL RDAT BELLEVUE HILL RDSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
West RoxburyMEREDITH STKENNETH STCLEMENT AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
West RoxburyPELTON STWEST ROXBURY SURFACE PKWYWEST ROXBURY PARKWAYAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
West RoxburyRISLEY RDHACKENSACK RDBROOKLINE TOWN LINEAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
         
 