Resurfacing By Neighborhood And Street

You can find a working list of streets below that the City of Boston plans on resurfacing or reconstructing during the 2021 construction season. This list is subject to change and may be altered to accommodate necessary underground infrastructure improvements or other unforeseen circumstances.

If you live on a street that is proposed for resurfacing or reconstruction and are thinking about installing a new service or upgrading a current service for your building, it is critical that you refer to our utilities fact sheet

Any delay may result in the street being paved and your ability to receive a permit for a service connection denied.

We created a page to explain the resurfacing process in more detail. If you have any questions, please contact the Construction Management division of Public Works at 617-635-4950.


Search By:     Or By:
NeighborhoodStreetFrom StreetTo StreetWork TypeEstimated StartDurationStatusCompleted
Allston/BrightonALCORN STCOMMONWEALTH AVASHFORD STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonAPPIAN WAYRAYMOND STFRANKLIN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonARDEN STHOOKER STCOOLIDGE RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonASHFORD STMALVERN STBABCOCK STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonBRACKETT STWASHINGTON STFANEUIL STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonCAMBRIDGE STN BEACON STCAMBRIDGE TERAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonCAMBRIDGE STLINCOLN ST- WINDOM STPED RAMP UPGRADE/NEW SIGNALSIntersection Only WorkTO BE DETERMINED3 WEEKSNOT STARTED 
Allston/BrightonCHESTER STCOMMONWEALTH AVEBRIGHTON AVEAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonCHESTNUT HILL AV@ WINSHIP STNASidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED  
Allston/BrightonCHESTNUTHILL AVBEACON STCOMMONWEALTH AVSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED 
Allston/BrightonCHISWICK RDCOMMONWEALTH AVECHESTNUT HILL AVECapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonCORINNE RDFALKLAND STRANELEGH RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonDICKINSON RDWASHINGTON STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonEVANS RDBROOKLINE TOWN LINECOREY RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonFANEUIL STMARKET STWASHINGTON STCapital ResurfacingJULY2 WEEKSNOT STARTED 
Allston/BrightonFISKE TERRBRAINERD RDBROOKLINE TOWN LINECapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonGUILFORD STSAUNDERS STPOMEROY STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonMT VERNON ST BRACADEMY HILL RD FOSTER ST BRFull ReconstructionTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonSOLDIER FIELD PLSOLDIERS FIELD RDDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BayARLINGTON STISABELLA STMELROSE STSidewalk ReconstructionJUNE3 MONTHSACTIVE 
Back BayBEACON STAT BERKELEY STPED RAMP UPGRADE/NEW SIGNALSIntersection Only WorkTO BE DETERMINED3 WEEKSNOT STARTED 
Back BayBEACON STARLINGTON STMASS AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BayBERKELEY STCOMMONWEALTH AV WB (ODD)BEACON STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BayDARTMOUTH STAT MARLBOROUGH STPED RAMP UPGRADE/NEW SIGNALSIntersection Only WorkTO BE DETERMINED3 WEEKSNOT STARTED 
Back BayEXETER STBOYLSTON ST BPBLAGDEN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BayMARLBOROUGH STARLINGTON ST BPBERKELEY STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BayNEWBURY STDARTMOUTH STEXETER STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BayNEWBURY STCLARENDON STDARTMOUTH STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BayPUBLIC ALLEY 401PUBLIC ALLEY 402 HARCOURT STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BaySTANHOPE STBERKELEY STTRINITY PLAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BayWESTLAND AVMASS AV- HEMENWAYPED RAMP UPGRADE/NEW SIGNALSIntersection Only WorkTO BE DETERMINED3 WEEKSNOT STARTED 
Beacon HillBEACON STPRESCOTT STWOLCOTT CTFull ReconstructionTO BE DETERMINED2 WEEKSNOT STARTED 
Beacon HillRIDGEWAY LNCAMBRIDGE ST BRDERNE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Beacon HillRIVER ST BPBEACON ST BPCHESTNUT ST BPAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Beacon HillTEMPLE STDERNE STCOOLIDGE AVPIC ResurfacingSEPTEMBER2 WEEKS  
Boston ProperFRANKLIN ST BPHAWLEY ST SARCH STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Boston ProperPARK STTREMONT ST BEACON STFull ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
CharlestownCARTER STCAMBRIDGE ST CHROLAND STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
CharlestownCORDIS STWARREN STHIGH STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
CharlestownELLWOOD STPUTNAM STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
CharlestownFIFTH STCHELSEA STFIRST AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
CharlestownHENLEY STHARVARD SQWARREN ST CHCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
CharlestownNINTH STTHIRD AVFIRST AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
CharlestownPUTNAM STDEAD ENDCOMMON STAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
CharlestownRUTHERFORD AVUNION ST DEVENS STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
CharlestownTHIRD AVTHIRTEENTH STSIXTHTEENTH STAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
CharlestownWASHINGTON STHARVARD STRUTHERFORD AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
CharlestownWOOD STMAIN STHIGH STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterBANTON STDORCHESTER AVDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterBLUE HILL AVWASHINGTON STGLENWAY STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterBLUE HILL AVCHENEY STGLEN LANEAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterBLUE HILL AVGLEN LANEAMERICAN LEGION HIGHWAYAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterCENTERVALE PKUPLAND AVBOURNESIDE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterDAKOTA STWASHINGTON STCLAYBOURNE STCapital ResurfacingSEPTEMBER2 WEEKSNOT STARTED 
DorchesterDORCHESTER AVAT BAILEY STAT BAILEY STSidewalk ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
DorchesterDORCHESTER AVWELLES AVTALBOT AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterDORCHESTER AV DOVON HILLERN STHOWELL STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterEAST COTTAGE ST HUMPHREYS STNORFOLK AVSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET 
DorchesterEPPING STWASHINGTON STNORFOLK STAsphalt ResurfacingJULY2 WEEKSNOT STARTED 
DorchesterEUCLID STWITHINGTON STWASHINGTON STFull ReconstructionTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterHARVARD ST AT SCHOOL ST AND THANE STPED RAMP UPGRADE/PLUS PAVINGIntersection Only WorkTO BE DETERMINED3 WEEKSNOT STARTED 
DorchesterHEWINS STCOLUMBIA RDERIE STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterLORENZO STWOODWORTH STWALNUT STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterMATHER STNIXON STLYNDHURST STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterNEW ENGLAND AVTALBOT AVWOODROW AVFull ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
DorchesterNORFOLK STWHITFIELD STEPPING STSidewalk ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED/GREEN INFRASTRUCTURE AT EPPING ST 
DorchesterNORTH MONROE TERRNEPONSET AV DOTRAIN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterOLD RDMICHIGAN AVCOLUMBIA RDSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET 
DorchesterPARK STAT NORWELL STPED RAMP UPGRADE/PLUS PAVINGIntersection Only WorkJULY2 WEEKSNOT STARTED 
DorchesterPARK ST DOGREENBRIER STWASHINGTON ST DOCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterQUINCEFIELD STHUMPHREYS STWENDOVER STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED  
DorchesterRICHFIELD STCOLUMBIA RDPURITAN AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterSOUTHERN AVAT WHIFIELD STPED RAMP UPGRADE/PLUS PAVINGIntersection Only WorkTO BE DETERMINED3 WEEKSNOT STARTED 
DorchesterTALBOT AVAT COLONIAL AVPED RAMP UPGRADE/PLUS PAVINGIntersection Only WorkTO BE DETERMINED3 WEEKSNOT STARTED 
DorchesterTILMAN STDORCHESTER AVDEAD ENDCapital ResurfacingSEPTEMBER2 WEEKSACTIVE 
DorchesterWASHINGTON STCOLUMBIA RDERIE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterWASHINGTON STBLUE HILL AVCOLUMBIA RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterWASHINGTON STTALBOT AVEPPING STFull ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED 
DorchesterWASHINGTON STERIE STHARVARD STAsphalt ResurfacingJULY2 WEEKSNOT STARTED 
DorchesterWASHINGTON STBRENT STEUCLID STFull ReconstructionTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterWOLCOTT STCOLUMBIA RDERIE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonBENNINGTON STMERIDIAN STLONDON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonBENNINGTON STLONDON STPRESCOTT STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonBENNINGTON STSWIFT ST425 E OF WORDSWORTH STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonCHELSEA STMAVERICK STGEORGE R VISCONTI RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonCRESTWAY RDFAYWOOD AVWALDEMAR AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonMERIDIAN STWHITE STMCARDLE, ANDREW P BRIDGECapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonNEPTUNE RDSARATOGA STBENNINGTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonSARATOGA STTRIDENT ST165' E OF TRIDENT STSidewalk ReconstructionTO BE DETERMINED2 WEEKSSIDEWALK RECON 
East BostonSUMNER STMAVERICK SQORLEANS STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonTRIDENT STSARATOGA STBENNINGTON STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED 
FenwayCOMMONWEALTH AVCHARLESGATE WEST350' E OF BEACON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
FenwayKESWICK STMEDFIELD STBEACON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
FenwayST ALBANS RDFRANCIS STHUNTINGTON AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
FenwaySTONEHOLM STNORWAY STEDGERLY RDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
FenwayTETLOW STEVANS WAYPALACE RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkCOLLINS ST HYDE PARK AV BRADLEE ST HPAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkRESERVATION ROADHYDE PARK AVWINTER STSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED  
Hyde ParkREYNOLD RDCHESTERFIELD STCOMO RDAsphalt ResurfacingSEPTEMBER2 WEEKSNOT STARTED 
Hyde ParkTHATCHER STHUNTINGTON AVMETROPOLITAN AVFull ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
Hyde ParkWESTMINSTER STPROVIDENCE STMETROPOLITAN AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkWINTER STGLENWOOD STRESERVATION RDSidewalk ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET 
Jamaica PlainARCOLA STDAY STDEAD ENDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainBISHOP STNEWBERN STEVERETT ST JPCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainCANTERBURY STAMERICAN LEGION HIGHWAYBOURNE STSidewalk ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
Jamaica PlainCHESTNUT SQCHESTNUT AVGLENVALE TRCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainGLENVALE TERRACELAMARTINE STCHESTNUT SQAsphalt ResurfacingSEPTEMBER2 WEEKSNOT STARTED 
Jamaica PlainHYDE PARK AVWASHINGTON STUKRAINE WAYAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainNIRA AVDAY STGROTTO GLEN RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainPERKINS STPRINCE STBROOKLINE TOWN LINEAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainPOND VIEW AVPERKINS ST JPPERSHING RDCapital ResurfacingAUGUST/SEPTEMBER2 WEEKSNOT STARTED 
Jamaica PlainROBINWOOD AVROBINWOOD AVLOCKSLEY STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainWESTERLY STCENTRE STSUNNYSIDE STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanBLUE HILL AV NBRHOADES ST WOODHAVEN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanBLUE HILL AV NBWOODHAVEN STREXFORD STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanBLUE HILL AV NBREXFORD STRIVER ST HPAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanBLUE HILL AV NBFREMONT STBABSON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanBLUE HILL AV NBHARVARD ST DOMORTON ST DO JPAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanBLUE HILL AV NBGREENOCK STRHOADES STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanBLUE HILL AV NBMORTON ST DO JPFREMONT STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanBLUE HILL AV NBANGELL STGREENOCK STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanBLUE HILL AV NBBABSON STRIVER ST HPAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanEDGEWATER DRATRIVER STFull ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
MattapanLEAHAVEN RDRIVER STMEADOWBANK AVFull ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
MattapanNEWCROFT CRRIVER STRIVER STFull ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
MattapanRITCHIE STRIVER STDEAD ENDFull ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
MattapanSOUTHMERE RDRIVER STLEDGEBROOK RDFull ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
Mission HillHARLESTON STCALUMET STPARKER HILL AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Mission HillPARKER HILL AVHUNTINGTON AVPARKER STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndCHARTER STHENCHMEN STCOMMERCIAL STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndCOOPER STSALEM STNORTH WASHINGTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndENDICOTT STTHACHER STNORTH WASHINGTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndGARDEN COURT STPRINCE ST BPFLEET ST BPAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndHULL STSALEM STCOMMERCIAL STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndMICHELANGELO STCHARTER ST DEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndSALUTATION STHANOVER ST BP NCOMMERCIAL ST BP NAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndSUN CT STNORTH SQNORTH STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndWIGET STSALEM STNORTH MARGIN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoslindaleBEECH STEUGENIA RDWASHINGTON STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyDUNMORE STDUDLEY STMAGAZINE STCapital ResurfacingSEPTEMBER2 WEEKSNOT STARTED 
RoxburyELMORE STKENSINGTON STWALNUT AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyGEORGE STMAGAZINE STSHIRLEY STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyGUILD ROWMALCOLM X BLVDWASHINGTON STFull ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
RoxburyHARRISON AVZEIGLER STWARREN STFull ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED 
RoxburyKEMBLE STGERARD STMAGAZINE STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyMALCOLM X BLVDDUDLEY ST100' W OF SHAWMUT AVFull ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
RoxburyMAPLE STGEORGIA STSEAVER STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyMASSACHUSETTS AVPROCTOR STNAPA STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyPARKER STFISHER AVHEATH SQ ROTARYAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyPARKER ST RXHEATH STBICKFORD STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyREED STNORTHAMPTON STEAST LENOX STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyRITCHIE STCOLUMBUS AVMARCELLAFull ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
RoxburyROXBURY STMALCOM X BLVDWASHINGTON STFull ReconstructionTO BE DETERMINED6 MONTHSNOT STARTED /DUDLEY SQ 
RoxburyRUGGLES ST ETREMONT STWASHINGTON STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED 
RoxburySHAWMUT AVMALCOLM X BLVD150' N OF MALCOLM X BLVDFull ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
RoxburySHERMAN STROCKLAND STDALE STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburySOUTHAMPTON STMASSACHUSETTS AVDORCHESTER AV DOAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyWARREN STDUDLEY STKEARSARGE AVFull ReconstructionAPRIL6 MONTHSNOT STARTED/ DUDLEY SQ 
RoxburyWARREN STPALMER STDUDLEY STFull ReconstructionTO BE DETERMINED6 MONTHSNOT STARTED DUDLEY SQ 
RoxburyWASHINGTON STDUDLEY STRUGGLES STFull ReconstructionTO BE DETERMINED6 MONTHSNOT STARTED DUDLEY SQ 
RoxburyWESTMINSTER AVWASHINGTON STWALNUT AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonCARPENTER STDEVINE, WILLIAM H WYPREBLE STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonD STWEST BROADWAYWEST FIRST ST SAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonDORCHESTER AVDEVINE, WILLIAM H WYKEMP STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonDRESSER STE STF STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonDRESSER STF STDORCHESTER STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonEAST FIFTH STG STH STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonGREENBAUM STDORCHESTER AVFOUNDRY STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonH STEAST BROADWAYEAST SIXTH STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonNEWHILL PLACEEAST THIRD STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonSILVER STE STDORCHESTER STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonSLEEPER STCONGRESS STSEAPORT BLVDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonSUMMER STEAST FIRST STELKINS STFull ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
South BostonSUMMER STEAST FIRST ST ELKINS STFull ReconstructionAPRIL- JULY4 MONTHSACTIVE  
South BostonTHOMAS PARKG STG STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonTHOMAS PARKG STG STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonTUDOR STLILLY STDORCHESTER STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonWOODWARD STDORCHESTER AVDORCHESTER STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South EndEAST BERKELEY STWASHINGTON STALBANY STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South EndEAST CONCORD STWASHINGTON STFATHER FRANCIS J GILDAY STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South EndPAUL PLSHAWMUT AVHERALD STFull ReconstructionFEBRUARY6 MONTHSACTIVE 
South EndTRAVELER STWASHINGTON STHARRISON AVSignal Installation WorkSEPTEMBER 20191 YEARACTIVE 
South EndWALTHAM STUNION PARK STTREMONT STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South EndWEST CANTON STTREMONT STCOLUMBUS AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South EndWEST SPRINGFIELD STTREMONT STCOLUMBUS AVAsphalt Resurfacing20202 WEEKSMAJOR UTILITY WORK IN 2019 WILL DELAY PAVING UNTIL 2020 
West RoxburyBAKER STJOHNSON STSPRING STAsphalt ResurfacingSEPTEMBER2 WEEKSNOT STARTED 
West RoxburyBAKER STCENTRE STJOHNSON STAsphalt ResurfacingSEPTEMBER2 WEEKSNOT STARTED 
West RoxburyCENTRE SST WR JP RXW ROXBURY PKWYMT VERNON ST JPAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
West RoxburyCHAPIN AVPRESTON STMT VERNON STFull ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
West RoxburyJACQUELINE RDBIRCHLAND AVANSONIA RDFull ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED 
West RoxburyLAGRANGE STAT BELLEVUE HILL RDAT BELLEVUE HILL RDSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED  
West RoxburyMONCLAIR AVSUNSET HILL RDCOLBY STCapital ResurfacingJULY2 WEEKSNOT STARTED 
West RoxburySTEARNS RDWASHINGTON STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
         
 