This website contains a working list of streets which the City of Boston plans on resurfacing or reconstructing during the 2018 construction season.

Please note that this list is subject to change and may be altered to accommodate necessary underground infrastructure improvements or other unforeseen circumstances.

If you live on a street that is proposed for resurfacing or reconstruction, and are thinking about installing a new service or upgrading a current service for your building, it is critical that you refer to the fact sheet located above the Street Resurfacing Limits table. Any delay may result in the street being paved and your ability to receive a permit for a service connection denied.

If you have any questions about the information displayed here, please contact the Public Works Department’s Construction Management division at: 617-635-4950.

Fact Sheet


Search By:     Or By:
NeighborhoodStreetFrom StreetTo StreetEstimated StartDurationStatusWork TypeCompleted
Allston/BrightonADAIR STFANEUIL STDEAD ENDTO BE DETERMINED2 WEEKSNOT STARTED Asphalt Resurfacing 
Allston/BrightonBEACON STAYR RDCHESTNUT HILL AVTO BE DETERMINED2 WEEKSNOT STARTED/TARGET STREET BAsphalt Resurfacing 
Allston/BrightonBENNETT STMARKET STPARSONS STTO BE DETERMINED2 WEEKSNOT STARTED Full Reconstruction 
Allston/BrightonBIGELOW STJUSTIN RDBROOKS STTO BE DETERMINED2 WEEKSNOT STARTED / TARGET STREET/UTILITY WORK STILL TO BE DONEAsphalt Resurfacing 
Allston/BrightonBLAINE STBRAINTREE STDEAD ENDTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Allston/BrightonBRAINARD RDHARVARD AV GRIGGS STTO BE DETERMINED2 WEEKSNOT STARTEDCapital Resurfacing 
Allston/BrightonBRIGHTON AV@CHESTER ST@CHESTER STTO BE DETERMINED3 MONTHSNOT STARTEDSidewalk Reconstruction 
Allston/BrightonCHARLESVIEW STBIGELOW STNEWTON STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Allston/BrightonCHESTNUT HILL AVBEACON STCOMMONWEALTH AVTO BE DETERMINED4 MONTHSRECON/ADV IN FALL LIKELY 2019 STARTFull Reconstruction 
Allston/BrightonCHESTNUT HILL AV@ WINSHIP STNATO BE DETERMINED3 MONTHSRECON/ADV IN FALL LIKELY 2019 STARTSidewalk Reconstruction 
Allston/BrightonCUMMINGS RDCOREY RDSERVICE RDMAY2 WEEKSCOMPLETED BCapital Resurfacing5/10/2018
Allston/BrightonCUSHMAN RDGLENCOE STDUSTIN STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Allston/BrightonDICKINSON RDWASHINGTON STDEAD ENDTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Allston/BrightonENGLEWOOD AVSUTHERLAND RDCHESNUT HILL AVTO BE DETERMINED2 WEEKSNOT STARTEDCapital Resurfacing 
Allston/BrightonFISKE TERBRAINERD RDBROOKLINE TOWN LINETO BE DETERMINED2 WEEKSNOT STARTED Capital Resurfacing 
Allston/BrightonFORDHAM RDBRIGHTON AV EB LANE (EVEN)SERVICE RD (OFF COMM AV WB)MAY2 WEEKSCOMPLETEDCapital Resurfacing5/10/18
Allston/BrightonGREYMERE RDWASHINGTON ST BRDEAD ENDTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Allston/BrightonHASKELL STHOOKER STCOOLIDGE RD BRTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Allston/BrightonHIGH ROCK WAYIMRIE RDGORDON STTO BE DETERMINED2 WEEKSNOT STARTEDAsphalt ResurfacingNA
Allston/BrightonHOBSON STFANEUIL STHOBART STAPRIL2 WEEKSCOMPLETEDAsphalt Resurfacing5/1/18
Allston/BrightonHUNNEWELL AVMATCHETT STBURTON STAPRIL2 WEEKSCOMPLETEDAsphalt Resurfacing4/30/18
Allston/BrightonJORDAN RDCOREY RDBROOKLINE TOWN LINEAPRIL2 WEEKSCOMPLETED/ ARP CARRY OVERAsphalt Resurfacing5/3/18
Allston/BrightonLANE PARKFOSTER ST BRLANE PARKTO BE DETERMINED2 WEEKSNOT STARTED Capital Resurfacing 
Allston/BrightonLAROSE PLMONASTERY RDDEAD ENDTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Allston/BrightonMALBERT RDWASHINTON ST BRDEAD ENDTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Allston/BrightonMT VERNON ST BRACADEMY HILL RD FOSTER ST BRTO BE DETERMINED2 WEEKSNOT STARTEDAsphalt Resurfacing 
Allston/BrightonNORTH CRESCENT CIRCUITBRECK AVDEAD ENDTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Allston/BrightonPRESENTATION RDWASHINGTON ST BRHUNNEWELL AVTO BE DETERMINED2 WEEKSNOT STARTEDCapital Resurfacing 
Allston/BrightonQUINT AVBRIGHTON AV EB LANE (EVEN)GLENVILLE AVTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Allston/BrightonRANSOM RDCLAYMOSS RDCOLBORNE RDTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Allston/BrightonROYCE RDSERVICE RD (OFF COMM AV EB)BRAINERD RDTO BE DETERMINED2 WEEKSNOT STARTED Capital Resurfacing 
Allston/BrightonRUSHMORE STACADEMY HILL RDMICHAEL RDTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Allston/BrightonSNOW STWASHINGTON STUNION STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt ResurfacingNA
Allston/BrightonST LUKES RDBRIGHTON AV EB LANE (EVEN)SERVICE RD (OFF COMM AV WB)TO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Allston/BrightonSUMMIT AVALLSTON STSERVICE RDTO BE DETERMINED2 WEEKSCOMPLETED/ CARRY OVERAsphalt Resurfacing5/3/18
Allston/BrightonSURREY STMARKET STFOSTERAPRIL2 WEEKSCOMPLETED Asphalt Resurfacing5/2/18
Allston/BrightonWILLISTON RDCOREY RDBROOKLINE TOWN LINEAPRIL-MAY2 WEEKSCOMPLETEDAsphalt Resurfacing5/3/18
Allston/BrightonWILSHIRE RDCHESTNUT HILL AVDEAD ENDTBD2 WEEKSNOT STARTED BAsphalt Resurfacing 
Allston/BrightonWM JACKSON AVCHESTNUT HILL AVDEAD ENDTBD2 WEEKSNOT STARTED BAsphalt Resurfacing 
Allston/BrightonWOODMONT STBROOKS ST BRDEAD ENDTBD2 WEEKSNOT STARTED BAsphalt Resurfacing 
Back BayARLINGTON STISABELA STMELROSE STTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
Back BayBOYLSTON STEXETER STFAIRFIELD STTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTSidewalk Reconstruction 
Back BayPUBLIC ALLEY 424CLARENDON STDARTMOUTH STTBD1 WEEKNOT STARTEDAsphalt Resurfacing 
Back BayPUBLIC ALLEY 434PUBLIC ALLEY 435PUBLIC ALLEY 433TBD2 WEEKSNOT STARTED Asphalt Resurfacing 
Back BayPUBLIC ALLEY 437ARLINGTON ST BERKELEY STTBD2 WEEKSNOT STARTED Capital Resurfacing 
Back BayPUBLIC ALLEY 439CLARENDON STDARTMOUTH STTBD2 WEEKSNOT STARTED Asphalt Resurfacing 
Beacon HillBEACON STTREMONT STPARK STTO BE DETERMINED2 WEEKSNOT STARTEDCapital ResurfacingNA
Beacon HillBEACON STPARK STARLINGTON ST BPTO BE DETERMINED2 WEEKSNOT STARTED B TARGETAsphalt Resurfacing 
Beacon HillBRANCH STSPRUCE STCLARLES STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Beacon HillJOY STBEACON STSMITH CT2017TBDCONNECT HISTORIC BOSTON   
Beacon HillWALNUT STBEACON STMT VERNON STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt ResurfacingNA
Boston ProperBATTERYMARCH STWATER STHIGH STTO BE DETERMINED2 WEEKSNOT STARTEDAsphalt Resurfacing 
Boston ProperCOURT STAT COURT SQUARE@ COURT SQUARETO BE DETERMINED3 MONTHSNOT STARTEDSidewalk Reconstruction 
Boston ProperDEVONSHIRE ST@ OLD STATE HOUSE@ OLD STATE HOUSETO BE DETERMINED4 MONTHSNOT STARTED Sidewalk Reconstruction 
Boston ProperFRIEND STMARKET STCAUSEWAY ST EB ODDTBDTBDNOT STARTED Full Reconstruction 
Boston ProperMARGINAL RDSHAWMUT AVARLINGTON STTBD2 WEEKSNOT STARTED B  
Boston ProperMARSH LNUNION STCREEK SQJULY 20171 YEARACTIVE/RECONSTRUCTION/CONNECT HISTORIC BOSTON  
Boston ProperMARSHALL STHANOVER STUNION STJULY 20171 YEARACTIVE/RECONSTRUCTION/CONNECT HISTORIC BOSTON  
Boston ProperNORTH STCONGRESS STSURFACE ARTERY RDTBDTBD NOT STARTED/CONNECT HISTORIC BOSTON  
Boston ProperNORTH STCONGRESS STUNION STJULY 20171 YEARACTIVE/RECONSTRUCTION/CONNECT HISTORIC BOSTON  
Boston ProperOLIVER STMILK STHIGH STTO BE DETERMINED2 WEEKSNOT STARTED Asphalt ResurfacingNA
Boston ProperPUBLIC ALLEY 102MARSHALL STCREEK SQTBDTBDNOT STARTED/RECONSTRUCTION/CONNECT HISTORIC BOSTON  
Boston ProperSALT LNUNION STSCOTT ALLEYJULY 20171 YEARACTIVE/RECONSTRUCTION/CONNECT HISTORIC BOSTON  
Boston ProperSCOTT ALLEYCREEK SQDEAD ENDJULY 20171 YEARACTIVE/RECONSTRUCTION/CONNECT HISTORIC BOSTON  
Boston ProperSTATE ST@ KILBY STAT KILBY STTO BE DETERMINED4 MONTHSNOT STARTEDSidewalk Reconstruction 
Boston ProperUNION STNORTH STHANOVER STAUGUST 20171 YEARACTIVE/RECONSTRUCTION/CONNECT HISTORIC BOSTON  
Boston ProperWINTHROP SQUAREAT OTIS ST @DEVONSHIRE STREETSAT OTIS @ DEVONSHIRE STREETSTO BE DETERMINED4 MONTHSNOT STARTED Sidewalk Reconstruction 
CharlestownBUNKER HILL CTBUNKER HILL STDEAD ENDTO BE DETERMINED2 WEEKSNOT STARTED Asphalt ResurfacingNA
CharlestownCEDAR STHIGH STBARTLETT STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt ResurfacingNA
CharlestownCHARBONNIER STMAIN STMAIN STTBD2 WEEKSARPAsphalt ResurfacingNA
CharlestownCONCORD STMONUMENT SQBUNKER HILL STTBD2 WEEKSNOT STARTED BAsphalt ResurfacingNA
CharlestownCONSTITUTION RDCHAMBER STCHELSEA STJULY 2017I YEARACTIVE/RECONSTRUCTION/CONNECT HISTORIC BOSTON  
CharlestownCORDIS STWARREN STHIGH STTBDTBDNOT STARTED BAsphalt Resurfacing 
CharlestownCROSS STHIGH STTRENTON STTBD2 WEEKSNOT STARTED BAsphalt ResurfacingNA
CharlestownDECATUR STVINE ST MEDFORD STTBD2 WEEKSNOT STARTEDAsphalt ResurfacingNA
CharlestownFIRST AVFIFTH STTHIRTEENTH STTBDTBDARP  
CharlestownHENLEY STHARVARD SQWARREN STTBD2 WEEKSNOT STARTED BAsphalt ResurfacingNA
CharlestownHILL STDEAD ENDCOOK STTBD2 WEEKSNOT STARTED BAsphalt Resurfacing 
CharlestownHUNTER STBUNKER HILL STVINE STTBDTBDARP  
CharlestownLYNDE STUNION STNEW RUTHERFORD AVTBD2 WEEKSARPAsphalt ResurfacingNA
CharlestownMONUMENT SQCHESTNUT STCHESTNUT STTBD2 WEEKSNOT STARTED BAsphalt ResurfacingNA
CharlestownMONUMENT STMONUMENT SQBUNKER HILL STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
CharlestownNEAREN ROWTREMONT STFERRIN STTBD2 WEEKSNOT STARTED BAsphalt ResurfacingNA
CharlestownNEW RUTHERFORD AVRUTHERFORD AVMISHAWUM STTO BE DETERMINED2 WEEKSNOT STARTED Asphalt Resurfacing 
CharlestownPLEASANT STDEVENS STMONUMENT SQTBD2 WEEKSNOT STARTED BAsphalt ResurfacingNA
CharlestownSEVENTH STTHIRD AVFIRST AVTBDTBDARP  
CharlestownSUMMER STELM STSCHOOL STTBDTBDARP  
CharlestownTREMONT STPROSPECT STLOWNEY WAYTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt ResurfacingNA
CharlestownTUFTS STBUNKER HILL STMEDFORD STTBDTBDARP  
CharlestownWALFORD WAYTUFTS STPOLK STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt ResurfacingNA
CharlestownWALFORD WAYDECATUR STSTARR KING CTTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt ResurfacingNA
CharlestownWALKER STMAIN STWALL STTBDTBDARP  
CharlestownWARREN STHENLY STMONUMENT AVTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt ResurfacingNA
CharlestownWOOD STMAIN STHIGH STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
ChinatownBEACH STATLANTIC AVSURFACE ROADTBD6 MONTHSNOT STARTEDFull Reconstruction 
DorchesterALGONQUIN STBRADLEE STHARVARD STTBDTBDNOT STARTEDCapital Resurfacing 
DorchesterANSEL ST(EVEN)ASHTON STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterARBORCREST TERGLADESIDE AVRIDGEVIEW AVTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterBALINA PLNORFOLK STDEAD ENDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterBARRINGTON RDBEAUMONT STELMER RDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterBEACH STFREEPORT STPARK STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterBEALE STDORCHESTER AVDEAD ENDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterBLANCHE STEVERDEAN STVICTORY RDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterBRANCHFIELD STMEDWAY STBUTLER STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterBUSHNELL STASHMONT STWEYANOKE STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterCARRUTH STASHMONT STGALLIVAN BLVDAPRIL- MAY2 WEEKSCOMPLETEDCapital Resurfacing5/3/18
DorchesterCHURCH STWINTER STFRUEAN PLTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterCLOVER STMINOT STGALLIVAN BLVDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterCLOVER STMINOT STGALLIVAN BLVDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterCONLEY STTENEAN STMORRISSEY BLVDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterCORWIN STARCADIA STWESTVILLE STTBDTBDCRP  
DorchesterDAVITT STSAVIN HILL AVEDEAD ENDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterDITSON STCHARLES STWESTVILLE STOCTOBER - NOVEMBER2 WEEKSCRP  
DorchesterDORCHESTER AVAT LINDEN STAT LINDEN STTO BE DETERMINED2 MONTHSNOT STARTEDSignal Installation Work 
DorchesterDUNBAR STWASHINGTON STWENTWORTH TERTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterEAST COTTAGE ST HUMPHREYS STNORFOLK AVTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTSidewalk Reconstruction 
DorchesterEAST STCHURCH STADAMS STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterEDSON STNORFOLK STMILTON AVTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterELTON STDORCHESTER AVEAUCKLAND STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterELY RDFREDERIKA STKENMARE RDTBDTBDARP  
DorchesterEUCLID STWASHINGTON STWITHINGTON STTO BE DETERMINED3 MONTHSNOT STARTED /CURRENTLY COORDINATING UTILITY SERVICE WORK TO BE INSTALLED NOWSidewalk Reconstruction 
DorchesterFAIRMOUNT STMILTON AVMORTON STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterFRANCONIA STADAMS STCHARLEMONT STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterFREEPORT WAYFREEPORT STDEAD ENDTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
DorchesterGENE STHUMPHREYS STBELDEN STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterGENEVA AVAT CHARLES AND WALDECK STREETSAT CHARLES AND WALDECK STREETSTO BE DETERMINED2 MONTHSNOT STARTEDSignal Installation Work 
DorchesterHOLDEN STCOLUMBIA RDBELDEN STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterHOWARD AVEDUDLEY STHARTFORD STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt ResurfacingN/A
DorchesterHOWE STHANCOCK STHOWE TERTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt ResurfacingN/A
DorchesterHUMES RDASHMONT STNAHANT AVMAY2 WEEKSCOMPLETED BAsphalt Resurfacing5/15/18
DorchesterHUMPHREYS PLHUMPHREYS STDEAD ENDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterIRMA STCALLENDER STWOODROW AVTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterJOANNE TERADAMS STDEAD ENDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterKANE STBELLEVUE STSTANLEY STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt ResurfacingN/A
DorchesterKINGSDALE STSTANDISH STBERNARD STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterLABAN PRATT RDBOUTWELL STWESTGLOSW STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterMALLARD AVMILLET STNEW ENGLAND AVTBDTBDARP  
DorchesterMAYBROOK STGLENWAY STGREENWOOD STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterMCKONE STNEPONSET AVMORRISSEY BLVDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterMENTON STGROVELAND STSTANDARD STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterMIDLAND STSAVIN HILL AVBAY STTBD2 WEEKSCRP  
DorchesterMILLET STPARK STTALBOT AVETO BE DETERMINED2 WEEKSNOT STARTED BAsphalt ResurfacingN/A
DorchesterMILTON ST GRANITE AVHALLET-DAVIS STTBDTBDARP  
DorchesterMILWOOD STGALLIVAN BLVDMILTON AVTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterMINOT STADAMS STCARRUTH STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterMT EVERETT STQUINCY STHAMILTON STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt ResurfacingN/A
DorchesterMT VERNON STMORRISSEY BLVDENDMAY2 WEEKSCOMPLETED BAsphalt Resurfacing5/14/18
DorchesterNEW ENGLAND AVTALBOT AVWOODROW AVTO BE DETERMINED4 MONTHSNOT STARTED /CURRENTLY COORDINATING UTILITY SERVICE WORK TO BE INSTALLED NOWFull Reconstruction 
DorchesterNONQUITDUDLEY STDEAD ENDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterNORTH AVEDUDLEY STBROOK AVETO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterOAKTON AVADAMS STPIERCE AVTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterODONNELL TERCENTRE STDEAD ENDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterOGDEN STFAIRMOUNT STDEAD ENDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterOLD MORTON STPLEASANT HILL AVSANFORD STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterOLD RDMICHIGAN AVCOLUMBIA RDTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTSidewalk Reconstruction 
DorchesterOLNEY STBOWDOIN STINWOOD STTBD2 WEEKSCRP  
DorchesterPARK STADAMS STDORCHESTER AVTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterPARK STADAMS STFREEPORT STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterPASADENA RDCOLUMBIA RDBLUE HILL AVETO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterPRESLEY RDGIBSON STCHRISTOPHER STTBDTBDARP  
DorchesterQUINCEFIELD STHUMPHREYS STWENDOVER STTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
DorchesterQUINCY STBLUE HILL AV COLUMBIA RDTO BE DETERMINED4 MONTHSNOT STARTED /CURRENTLY COORDINATING UTILITY SERVICE WORK TO BE INSTALLED NOWFull Reconstruction 
DorchesterQUINCY STBLUE HILL AVCOLUMBIA RD NB LANE (ODD)TBD1 MONTHRECON  
DorchesterRADFORD LNCARRUTH STBUSHNELL STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterRICHFIELD STHAMILTON STOLNEY STTBDTBDARP  
DorchesterRIPLEY RDHARVARD STCARMEN STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterROSEDALE STWASHINGTON STWHITFIELD STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterROWENA STCARRUTH STBUSHNELLSTTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterRUNDEL PARKASHMONT STELMER RDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterSAMOSET STROSELAND STWELLES AVMAY-JUNE2 WEEKSCRPCapital ResurfacingN/A
DorchesterSANFORD STMORTON STCEDAR STTBD4 MONTHSRECON  
DorchesterSANTUIT STROSELAND ST WELLES AVTBDTBDARP  
DorchesterSAVIN HILL AVPLEASANT STDORCHESTER AVMAY2 WEEKSCRPCapital Resurfacing5/8/2018
DorchesterSAVIN HILL AVDORCHESTER AVHUBBARDSTON RD20182 WEEKSARP ACTIVE UTILITY WORK DELAYS PAVING UNTIL 2018  
DorchesterSHENANDOAH STCARRUTH STWESSEX STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterSOUTHWICK STNEPONSET AVFREEPORT STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterTUPELO STSAVIN STQUINCY PLTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterVAN WINKLE STBUSHNELL STCARRUTH STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterVICTORY RDEVERDEAN STVICTORY RDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterWINSTON RDWILLOWWOOD STFRONTENAC STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterWOLCOTT STCOLUMBIA RDERIE STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterWOLLASTON TERWOODROW AVJONES AVTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
DorchesterWYOLA STCOLUMBIA RDSUSI YARDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
DorchesterYORK STGLENWAY STGREENWOOD STTO BE DETERMINED2 WEEKSCCapital ResurfacingN/A
East BostonBAYSWATER STSARATOGA STST ANDREW RDTO BE DETERMINED2 WEEKSARPAsphalt Resurfacing 
East BostonBREMEN STSUMNER STMAVERICK STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingNA
East BostonCHELSEA STMAVERICK STGEORGE R VISCONTI RDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
East BostonCOWPER STMOORE STBYRON STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
East BostonCOWPER STBYRON STDEAD ENDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
East BostonCURTIS STCHELSEA STCURTIS STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
East BostonFAYWOOD STCRESTWAY RDORIENT AVTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
East BostonFORD STSARATOGA STBREED STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingNA
East BostonFRANKFORT STNEPTUNE RDDEAD ENDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
East BostonGEORGE R VISCONTI RDCHELSEA STPARIS STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
East BostonHAVRE STGEORGE R VISCONTI RDMARION STTBDTBDARP  
East BostonHORACE STHARMONY STBYRON STTBDTBDCRP  
East BostonJEFFRIES STMAVERICK STSUMNER STTBDTBDARP  
East BostonMERIDIAN STLONDON STLONDON STTO BE DETERMINED2 WEEKSSIGNAL INSTALLATIONSignal Installation WorkNA
East BostonPARIS STSUMNER STMERIDIAN STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
East BostonPRESCOTT STEAST EAGLE STBREMEN STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
East BostonSARATOGA STTRIDENT STBURGER KING DRIVEWAYTO BE DETERMINED2 WEEKSSIDEWALK RECONSidewalk ReconstructionNA
East BostonTRIDENT STSARATOGA STBENNINGTON STTO BE DETERMINED4 MONTHSNOT STARTED RECON/ADVERTISE IN FALL/ LIKELY START IN 2019Full Reconstruction 
East BostonWHITBY STFORD STDEAD ENDTO BE DETERMINED2 WEEKSNOT STARTEDCapital Resurfacing 
East BostonWORDSWORTH STCHARLES ERNEST ANDREW FbCOLERIDGE STTO BE DETERMINED2 WEEKSNOT STARTEDAsphalt Resurfacing 
FenwayAVENUE LOUIS PASTEUR AVFENWAY LONGWOOD AVJUNE2 WEEKSNOT STARTEDAsphalt Resurfacing 
FenwayBINNEY STFRANCIS STCHILDRENS RDTO BE DETERMINED2 WEEKSNOT STARTEDAsphalt Resurfacing 
FenwayBOYLSTON STYAWKEY WYKILMARNOCK STTBDTBDRECON  
FenwayBROOKLINE AVFENWAY BROOKLINE TOWN LINETO BE DETERMINED2 WEEKSNOT STARTED/ COORDINATING UTILITY WORK FIRST/ LIKELY HOLDING OFF PAVING UNTIL THE FALL OR 2019Asphalt Resurfacing 
FenwayBURBANK STEDGERLY RDHEMENWAY STTBDTBDNOT STARTED/ACTIVE BUILDING WORK WILL HOLD OFF PAVING UNTIL THE FALL OR 2019Capital Resurfacing 
FenwayFRANCIS STBROOKLINE AVRIVERWAYTO BE DETERMINED2 WEEKSARP 2018 BAsphalt ResurfacingN/A
FenwayHUNTINGTON AV UNDRPS EBHUNTINGTON AVGAINSBOROUGH STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
FenwayHUNTINGTON AV UNDRPS WBHUNTINGTON AVHUNTINGTON AVTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
FenwayKENMORE STNEWBURY STCOMMONWEALTH STTBDTBDARP  
FenwayLONGWOOD AVHUNTINGTON AVBROOKLINE AVTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt ResurfacingN/A
FenwayMEDFIELD STPARK DRBROOKLINE TOWN LINETO BE DETERMINED2 WEEKSARP 2018Asphalt ResurfacingN/A
Hyde ParkBEAVER STCLEVELANDDEAD ENDMAY2 WEEKSCOMPLETEDAsphalt Resurfacing5/16/18
Hyde ParkBRAEWOOD STAUSTIN STBRAEBURN RDMAY2 WEEKSACTIVEAsphalt Resurfacing 
Hyde ParkCENTRAL AVARLINGTON STGREENWOOD AVTO BE DETERMINED2 WEEKSNOT STARTED Asphalt Resurfacing 
Hyde ParkDANA AVPINGREE STHYDE PARK AVTBDTBDCRP  
Hyde ParkDAVISON STFAIRMOUNT AVWALTER STTO BE DETERMINED2 WEEKSNOT STARTEDAsphalt Resurfacing 
Hyde ParkERNEST AVWEST MILTON STRIVER STTO BE DETERMINED2 WEEKSNOT STARTED Capital Resurfacing 
Hyde ParkFAIRMOUNT AVCENTRAL AVTRUMAN PKWY (ODD)TO BE DETERMINED2 WEEKSNOT STARTEDCapital Resurfacing 
Hyde ParkFAIRMOUNT AVHIGHLAND STSUMMIT STTO BE DETERMINED2 WEEKSNOT STARTED Capital Resurfacing 
Hyde ParkGRANTLEY STHYDE PARK AVDEAD ENDAPRIL4 MONTHSNOT STARTED Full Reconstruction 
Hyde ParkGREENWOOD ST#185HYDE PARK AVETO BE DETERMINED2 WEEKSNOT STARTED Asphalt Resurfacing 
Hyde ParkHADWIN WAYHYDE PARK AVHARDING RDTO BE DETERMINED2 WEEKSNOT STARTED Capital Resurfacing 
Hyde ParkHYDE PARK AV AT DANA AVAT DANA AVTO BE DETERMINED2 MONTHSSIGNAL INSTALLATIONSignal Installation WorkN/A
Hyde ParkHYDE PARK AVAT MILTON STAT MILTON STTO BE DETERMINED3 MONTHSNOT STARTEDSignal Installation Work 
Hyde ParkHYDE PARK AV MILTON STWOLCOT SQUARETO BE DETERMINED3 MONTHSNOT STARTEDSidewalk Reconstruction 
Hyde ParkLINCOLN STRIVER STHARVARD STTO BE DETERMINED2 WEEKSNOT STARTED Capital Resurfacing 
Hyde ParkMEADOWVIEW RDSTANBORO STDEAD ENDTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Hyde ParkMILTON STNEPONSET VALLEY PKWYSPRAUGUE STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Hyde ParkMILTON STAT NEPONSET VALLEY PKWYAT NEPONSET VALLEY PKWYTO BE DETERMINED2 MONTHSNOT STARTED Signal Installation Work 
Hyde ParkNEPONSET VALLEY PKWYAT WOLCOTT SQAT WOLCOTT SQTO BE DETERMINED2 MONTHSNOT STARTED Signal Installation Work 
Hyde ParkPINGREE STHYDE PARK AVDANA AVTO BE DETERMINED2 WEEKSNOT STARTED Asphalt Resurfacing 
Hyde ParkPOYDRAS STRIVER STDEAD ENDTO BE DETERMINED2 WEEKSNOT STARTED B Asphalt Resurfacing 
Hyde ParkRESERVATION ROADHYDE PARK AVWINTER STTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTSidewalk Reconstruction 
Hyde ParkSECOND NEW WAY STNOTT ST FAIRMOUNT AVMAY2 WEEKSACTIVE BAsphalt Resurfacing 
Hyde ParkSTONEHILL RDALWIN STALWIN STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Hyde ParkSTURBRIDGE STRIVER STSANFORD STTO BE DETERMINED2 WEEKSNOT STARTED Asphalt Resurfacing 
Hyde ParkTHATCHER STHUNTINGTON AVMETROPOLITAN AVTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTSidewalk Reconstruction 
Hyde ParkTRACTON AVTILESTON STDEAD ENDTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Hyde ParkWEBSTER STRIVER STHYDE PARK AVTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Hyde ParkWESTMINISTER STPROVIDENCE STWESTMINISTER STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
Hyde ParkWINTER STGLENWOOD STRRESERVATION RDTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
Hyde ParkWOLCOTT STWOLCOTT CTRILEY RDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingACTIVE
Jamaica PlainAVON STPARKSIDE DRBROOKLINE TOWN LINETO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
Jamaica PlainBEECHER STPAUL GORE STBOYLSTON STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
Jamaica PlainBILTMORE STCERINA RDCHESTNUT AVETO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
Jamaica PlainBOURNE STWALK HILL STCANTERBURY STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
Jamaica PlainCANTERBURY STMT HOPE STAMERICAN LEG HWY NB LANE (EVEN)TO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
Jamaica PlainCATHERINE STBOURNE STFLORIAN STTBDTBDARP  
Jamaica PlainDANFORTH STWYMAN STPAUL GORE STTBDTBDCRP  
Jamaica PlainFORBES STCENTRE STCHESTNUT AVETO BE DETERMINED2 WEEKSCRPCapital ResurfacingNA
Jamaica PlainHALLIDAY STNEPONSET AVEBOURNE STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
Jamaica PlainHAMPSTEAD RDARBORWAY SERVICE RDDEAD END (N)TO BE DETERMINED2 WEEKSNOT STARTED Asphalt ResurfacingNA
Jamaica PlainMCBRIDE STSOUTH STLEE STTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTSidewalk Reconstruction 
Jamaica PlainMOSS HILL RDSURREYHILL LNSLOCUM RDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingNA
Jamaica PlainOLMSTEAD STFOREST HILLS STPETER PARLEY RDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingNA
Jamaica PlainPERKINS STPRINCE STBROOKLINE TOWN LINETO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
Jamaica PlainPRINCE STPOND ST (80-460)PERKINS ST2 WEEKS2 WEEKSARPAsphalt Resurfacing 
Jamaica PlainROBINWOOD AVE (1-85)ROBINWOOD AVE(86-110)ENFIELD STTO BE DETERMINED2 WEEKSARPAsphalt Resurfacing 
Jamaica PlainROSEMARY STSOUTH STSPALDING STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingNA
Jamaica PlainSOUTH STARBORWAYBUSSEY STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
Jamaica PlainWASHINGTON STARCHDALE RDBASILE STTO BE DETERMINED2 WEEKSNOT STARTED/ TRAVEL LANES ONLY/ NEW GAS MAIN NEXT YEARCapital ResurfacingNA
Jamaica PlainWESTCHESTER RDCENTRE STDEAD ENDTBDTBDSDWK RECON  
MattapanARBUTUS ST(EVEN)LUCERNE STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingNA
MattapanBALLOU AVEWOODROW AVEJACOB STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingNA
MattapanCLARKWOOD ST(EVEN)NORFOLK STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
MattapanCOLORADO STMESSINGER STCANAAN STMAY2 WEEKSARPAsphalt Resurfacing5/15/18
MattapanCULBERT STWOODHAVEN STDEAD ENDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingNA
MattapanCUMMINS HWYMT CALVARY RDHARVARD STJUNE2 WEEKSNOT STARTEDAsphalt ResurfacingN/A
MattapanDYER STCAPEN STEVANS STTBDTBDARP  
MattapanEDGEWATER DRRIVER STMATTAKEESET STAPRIL1 MONTHCOMPLETEDFull Reconstruction4/24/18
MattapanELLARD RDWOOD AVAYLES RDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
MattapanKENNEBEC STCUMMINS HWYMARISPOSA STAPRIL-MAYONE MONTHCOMPLETEDFull Reconstruction5/14/2018
MattapanLEDGEBROOK RDRIVER STMEADOWBANK AVTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
MattapanLEEHAVEN RDRIVER STMEADOWBANK AVTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
MattapanMEADOWBANK AVRIVER STDEAD ENDTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
MattapanNEWCROFT CIRCLERIVER STRIVER STTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
MattapanOUTLOOK RDDUKE STHILLSBORO RDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
MattapanROSEWOOD ST(ODD)RECTOR RDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
MattapanRUGBY RD(ODD)BLAKE ST)TO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
MattapanSOUTHMERE RDRIVER STLEDGEBROOK RDTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
MattapanSTOCKWELL STWAIT STFRAWLEY STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
MattapanTAMPA STCUMMINS HWYSEMINOLE STTBDTBDCRP  
MattapanTOPALIAN STRIVER STEDGEWATER DRTO BE DETERMINED3 MONTHSNOT STARTEDSidewalk Reconstruction 
MattapanWAIT STHUNTINGTON AVDEAD ENDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
Mission HillSTOCKWELL STWAIT STHUNTINGTON AVTO BE DETERMINED2 WEEKSNOT STARTEDCapital Resurfacing 
Mission HillWAIT STHUNTINGTON AVDEAD ENDTO BE DETERMINED2 WEEKSNOT STARTEDCapital Resurfacing 
North EndHANOVER STCROSS STCOMMERCIAL STTBDTBDARP  
North EndLA FAYETTE AVENDICOTT STPRINCE STTBDTBDCRP  
North EndMICHELANGELO STDILLAWAY PLDEAD ENDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
North EndMOON STNORTH SQUARE LEWIS STTO BE DETERMINED4 MONTHSNOT STARTED Full Reconstruction 
North EndNORTH SQPRINCE STMOON STJUNE THROUGH OCTOBER5 MONTHSNOT STARTEDFull Reconstruction 
North EndNORTH STCLARK STCOMMERCIAL STTBD2 WEEKSARP  
North EndWIGET STSALEM STNORTH MARGIN STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
RoslindaleALPHEUS RDBEECH STBATEMAN STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
RoslindaleAMHERST STBELGRADE AVPENFIELD STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
RoslindaleBELGRADE AVSOUTH STROBERT STTO BE DETERMINED2 WEEKSCOMPLETEDCapital Resurfacing4/26/18
RoslindaleBERYL STCORNELL STALDRICH STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
RoslindaleBIRCH STCORINTH STDURNELL STTO BE DETERMINED2 WEEKSNOT STARTED Asphalt Resurfacing 
RoslindaleBIRCH STBELGRADE AVECORINTH STAPRIL2 WEEKSCRPCapital Resurfacing4/26/18
RoslindaleCANTERBURY STBOURNE STNEPONSET AVTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTSidewalk Reconstruction 
RoslindaleCOLBERG AVREXHAME STBEECH STTBDTBDARP  
RoslindaleCONWAY STSOUTH CONWAY STARBOROUGH RDTBDTBDCRP  
RoslindaleCORINTH STROBERT STWASHINGTON STAPRIL2 WEEKSCRPCapital Resurfacing4/29/18
RoslindaleHILLOCK STBERYL STCORNELL STTBD4 MONTHSNOT STARTEDFull Reconstruction 
RoslindaleKITTERDGE STAT WHITFORD STAT WHITFORD STTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTSidewalk Reconstruction 
RoslindaleMELCALF STPENFIELD STDURNELL AVETO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
RoslindalePOPLAR STSOUTH STCORINTH STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
RoslindaleROBERT STCORINTH STBROOKFIELD STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
RoslindaleROWE STBROWN AVCUMMINS HWYTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
RoslindaleSOUTH STWASHINGTON STBELGRADE AVTO BE DETERMINED2 WEEKSCRPCapital Resurfacing 
RoslindaleSOUTH STAT BUSSEY STAT BUSSEY STTO BE DETERMINED3 MONTHSNOT STARTEDSidewalk Reconstruction 
RoslindaleWASHINGTON STSOUTH STPOPLAR STAPRIL2 WEEKSCOMPLETEDCapital Resurfacing4/29/18
RoxburyBETHUNE WAYZEIGLER STEUSTIS STTBDTBDARP  
RoxburyBROOK MARSHALL RDRUGGLES STSOJOURNER TRUTH CTTBD2 WEEKSRECON  
RoxburyCEDAR STCOLUMBUS AVTERRACE STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
RoxburyDEWITT DRKERR PLSHAWMUT AVTBD1 MONTHRECON  
RoxburyDORR STHIGHLAND STLAMBERT AVTO BE DETERMINED2 WEEKSNOT STARTEDCapital Resurfacing 
RoxburyDUBOIS STORCHARD PK STADAMS STTO BE DETERMINED2 WEEKSNOT STARTED BAsphalt Resurfacing 
RoxburyDUDLEY STWARREN STWINSLOW STTO BE DETERMINED2 WEEKSNOT STARTED/DEVELOPMENT AND UTILITY WORK MAY DELAY UNTIL 2019Asphalt Resurfacing 
RoxburyDUDLEY STMAGAZINE STEAST COTTAGE STTO BE DETERMINED2 WEEKSNOT STARTED/DEVELOPMENT AND UTILITY WORK MAY DELAY UNTIL 2019Asphalt ResurfacingN/A
RoxburyEAST LENOX STHARRISON AVWASHINGTON STTO BE DETERMINED4 MONTHSNOT STARTEDFull ReconstructionN/A
RoxburyESTABROOK RDSHAWMUT AVDEWITT DRTBDTBDRECON  
RoxburyGREENVILLE ST DUDLEY STWINTHROP STOCTOBER-NOVEMBER2 WEEKSCRP  
RoxburyHARRISON AVMELNEA CASS BLVDEAST LENOX STTO BE DETERMINED2 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTSidewalk ReconstructionN/A
RoxburyJUNIPER TERJUNIPER STWASHINGTON STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
RoxburyKERR PLDEWITT DRSOJOURNER TRUTH CTTBD1 MONTHRECON  
RoxburyKERR WAYRUGGLES STKERR PLTO BE DETERMINED2 MONTHSFULL RECONSTRUCTIONFull ReconstructionN/A
RoxburyMALCOM X BLVDAT KING STAT KING STTO BE DETERMINED4 MONTHSNOT STARTEDFull Reconstruction 
RoxburyMT PLEASANT AVDUDLEY STDUDLEY STTO BE DETERMINED2 WEEKSCRPCapital Resurfacing 
RoxburyNEWCOMB STHARRISON AVWASHINGTON STTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
RoxburyNORTHAMPTON STTREMONT STCOLUMBUS AVTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
RoxburyRAYNOR CIRBROOK MARSHALL RDRUGGLES STTBD1 MONTHRECON  
RoxburyREED STEAST LENOX STENDTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
RoxburyRITCHIE STCOLUMBUS AVMARCELLA STTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
RoxburyRUGGLES ST ESHAWMUT AVTREMONT STTBD2 WEEKSRECON  
RoxburySHAWMUT AVMELNEA CASS BLVDMADISON PARK CTTO BE DETERMINED3 MONTHSNOT STARTED 1 SIDESidewalk Reconstruction 
RoxburySOJOURNER TRUTH CTKERR PLACEMELNEA CASS BLVDTO BE DETERMINED4 MONTHSNOT STARTEDFull Reconstruction 
RoxburyTHORNDIKE STHARRISON AVWASHINGTON STTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
RoxburyWAUMBECK STHUMBOLDT AVCRAWFORD STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
RoxburyWIGGLESWORTH STTREMONT STHUNTINGTON AVTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
RoxburyWILLIAMS STEUSTIS STSHAWMUT AVTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
South BostonBECKLER AVK STDEAD ENDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
South BostonD STWEST FIRST STSUMMER STAPRIL2 WEEKSCOMPLETEDAsphalt Resurfacing4/22/18
South BostonDRESSER STE STDORCHESTER STTO2 WEEKSCRPCapital ResurfacingN/A
South BostonEAST NINTH STWEST NINTH STMERCER STMAY2 WEEKSARPAsphalt Resurfacing5/11/18
South BostonEAST SECOND STDORCHESTER STM STTBDTBDNOT STARTED BAsphalt ResurfacingON HOLD UNTIL UTILITY WORK IS COMPLTED
South BostonEMERSON STL STM STTO BE DETERMINED2 WEEKSNOT STARTEDCapital ResurfacingN/A
South BostonG STDORCHESTER STEAST BROADWAYTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
South BostonJAY STEAST FIFTH STDEAD ENDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
South BostonK STEAST SECOND STEAST BROADWAYOCTOBER2 WEEKSCRP COMPLETED  
South BostonL STSUMMER STEAST SIXTH STOCTOBER2 WEEKSCRP COMPLETED  
South BostonLOVIS ST WEST FIFTH STGOLD STTBDTBDRECON  
South BostonN ST933EAST BROADWAYTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
South BostonSANGER STEAST SEVENTH STEAST EIGHTH STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
South BostonSUMMER STEAST SEVENTH STEAST EIGHTH STTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTSidewalk Reconstruction 
South BostonSUMMER STMELCHER STWEST SERVICE RDAPRIL- JULY4 MONTHSACTIVE Full Reconstruction 
South BostonVICKSBURG STEAST FIRST STEAST SECOND STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
South BostonWEST NINTH STD STE STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
South BostonWEST NINTH STD STE STTBDTBDARP  
South BostonWEST SECOND STA STB STTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
South BostonWOODWARD STDORCHESTER AVWARD STTBDTBDARP  
South EndBRADFORD STWALTHAM STMILFORD STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
South EndCOLUMBUS AVMASS AVTREMONT STTBDTBDARP  
South EndDEACON STWORCESTER STWEST CONCORD STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
South EndEAST BERKELEY STTREMONT STCOLUMBUS AVAUGUST 2016JULYRECONSTRUCTION/ACTIVE  
South EndHARRISON AVHERALD STEAST BERKELEY STTBDTBDRECON  
South EndMARGINAL RDSHAWMUT AVARLINGTON STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
South EndPAUL PLACESHAWMUT AVHERALD STTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
South EndPAUL SULLIVAN WAYHARRISON AVALBANY STTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
South EndRUTLAND STSHAWMUT AVRUTLAND SQTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
South EndWEST SPRINGFIELD STTREMONT STCOLUMBUS AVTBDTBDARP  
West RoxburyACACIA RDCENTRE STANSONIA RDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
West RoxburyALWARD RDWELD STBUCHANAN RDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
West RoxburyATWILL RDPARK STRICHWOOD STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburyBUCHANAN RDPRESIDENT RDBURRWOOD RDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
West RoxburyCENTRE STMT VERNON STELGIN STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
West RoxburyCHAPIN STMT VERNON STPRESTON RDTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
West RoxburyCOREY STVFW PARKWAYFURBUSH RDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
West RoxburyCOREY STFURBUSH RDNEWTON TOWN LINETO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburyCOREY STPARK STRAILROAD STTBDTBDNOT STARTEDFull Reconstruction 
West RoxburyCROSSTOWN AVSALMAN STDEDHAM TOWN LINETO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburyCURLEW STMAPLEWOOD STENDTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
West RoxburyCYPRESS STBAKER STSPRING STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburyDUNWELL STBAKER STHELDUN STTBDTBDCRP  
West RoxburyFRANCESCA STVERMONT STKEITH STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
West RoxburyFURBUSH RDLA GRANGE STCOREY STTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
West RoxburyHEMLOCK RD GOULD STCALEDONIAN AVTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburyHILCREST STELGIN STTEMPLE STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburyJACQUELINE RDANSONIA RDBIRCHLAND AVTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTFull Reconstruction 
West RoxburyJESHURUN STGROVE STDEAD ENDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburyKEANE RDVFW PARKWAYBROOK FARM RDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
West RoxburyKIERNAN RDCASPER STDEAD ENDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
West RoxburyKIRK STMONTVIEW STFERNCROFT RDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
West RoxburyLAGRANGE STAT BELLEVUE HILL RDAT BELLEVUE HILL RDTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 STARTSidewalk Reconstruction 
West RoxburyLAGRANGE STCENTRE STVFW PARKWAYTBDTBDARP  
West RoxburyLANDSEER STBELLEVUE STLA GRANGE STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburyLOYOLA CIRLAGRANGE STDEAD ENDMAY2 WEEKSCOMPLETED BAsphalt Resurfacing5/16/2018
West RoxburyMARLIN RDCOREY ST DEAD ENDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
West RoxburyMEREDITH STKENNETH STCLEMENT AVTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburyNEWFIELD STVFW PARKWAYBROOK FARM RDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
West RoxburyPELTON STWEST ROXBURY SURFACE PKWYWEST ROXBURY PARKWAYTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburyRAILROAD STCOREY ST380' E OF COREY STTO BE DETERMINED4 MONTHSNOT STARTED Full Reconstruction 
West RoxburyREDLANDS RDCENTRE STALAMEDA RDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburyRISLEY RDHACKENSACK RDBROOKLINE TOWN LINETO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburySHERBROOK STLA GRANGE STDENT STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburySTEARNS RDWASHINGTON STDEAD ENDTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburySUNSET HILL RDSUNSET HILL PATHDEAD ENDTO BE DETERMINED2 WEEKSCRPCapital ResurfacingN/A
West RoxburyVARICK RDTEMPLE STBAKER STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburyVERMONT STLA GRANGE STBAKER STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
West RoxburyWEST BOUNDRY RDGEORGETOWNE DRWASHINGTON STTO BE DETERMINED2 WEEKSARPAsphalt ResurfacingN/A
         
 