You can find a working list of streets below that the City of Boston plans on resurfacing or reconstructing during the 2019 construction season. This list is subject to change and may be altered to accommodate necessary underground infrastructure improvements or other unforeseen circumstances.

If you live on a street that is proposed for resurfacing or reconstruction and are thinking about installing a new service or upgrading a current service for your building, it is critical that you refer to our utilities fact sheet

Any delay may result in the street being paved and your ability to receive a permit for a service connection denied.

We created a page to explain the resurfacing process in more detail. If you have any questions, please contact the Construction Management division of Public Works at 617-635-4950.


Search By:     Or By:
NeighborhoodStreetFrom StreetTo StreetWork TypeEstimated StartDurationStatusCompleted
Allston/BrightonACADEMY CTACADEMY RDDEAN ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonADAIR STFANEUIL STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonBEACON STAYR RDCHESTNUT HILL AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonBIGELOW STJUSTIN RDBROOKS STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED/ON HOLD…CURRENTYCOORDINATING UTILITY WORK TO BE DONE BEFORE WE PAVE 
Allston/BrightonBLAINE STBRAINTREE STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonBRIGHTON AV@CHESTER ST@CHESTER STSidewalk ReconstructionMAY- JULY3 MONTHSACTIVE 
Allston/BrightonBRIGHTON AVCAMBRIDGE STHARVARD STAsphalt ResurfacingAPRIL2 WEEKSNOT STARTED/ BUS LANE 
Allston/BrightonBRIGHTON AVHARVARD STCOMMONWEALTH AVAsphalt ResurfacingAPRIL2 WEEKSNOT STARTED 
Allston/BrightonCAMELOT CTWARREN STGORDON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonCHARLESVIEW STBIGELOW STNEWTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonCHESTNUT HILL AVBEACON STCOMMONWEALTH AVFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
Allston/BrightonCHESTNUT HILL AV@ WINSHIP STNASidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
Allston/BrightonCOMMONWEALTH AV EBESSEX STNAPLES STMassDOT ReconstructionNOVEMBER 2017 -NOVEMBER 20191 YEARACTIVE/MASSDOT RECON /NEWPORT CONTRACTOR 
Allston/BrightonCOMMONWEALTH AV WBUNIVERSITY RDALCORN STMassDOT ReconstructionNOVEMBER 2017 - NOVEMBER 20191 YEARACTIVE/MASSDOT RECON /NEWPORT CONTRACTOR 
Allston/BrightonCUSHMAN RDGLENCOE STDUSTIN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonDICKINSON RDWASHINGTON STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED / NATIONAL GRID NEW MAIN WILL DELAY UNTIL 2020 
Allston/BrightonELECTRIC AVPARSONS STGOODENOUGH STEversource Electric ResurfacingAPRIL/MAY2 WEEKSNOT STARTED 
Allston/BrightonFANEUIL STMARKET STBIGELOW STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED/ NEW EVERSOURCE ELECTIC AND NATIONAL GRID MAINS WILL DELAY PAVING UNTIL FALL 
Allston/BrightonFISKE TERBRAINERD RDBROOKLINE TOWN LINECapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonGOODENOUGH STNORTH BEACON STFANEUIL STEversource Electric ResurfacingAPRIL/MAY2 WEEKSNOT STARTEDNOT STARTED
Allston/BrightonGORDON STNORTH BEACON STCAMBRIDGE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED NEW EVERSOURCE ELECTIC AND NATIONAL GRID MAINS WILL DELAY PAVING UNTIL FALL 
Allston/BrightonGREYMERE RDWASHINGTON ST BRDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonGUILFORD STSAUNDERS STPOMEROY STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED NEW EVERSOURCE ELECTIC AND NATIONAL GRID MAINS WILL DELAY PAVING UNTIL FALL 
Allston/BrightonIMRIE RDCAMBRIDGE STDEAD ENDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED NEW EVERSOURCE ELECTIC AND NATIONAL GRID MAINS WILL DELAY PAVING UNTIL FALL 
Allston/BrightonLANARK RDKILSYTH RDKINROSS RDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED NEW EVERSOURCE ELECTIC AND NATIONAL GRID MAINS WILL DELAY PAVING UNTIL FALL 
Allston/BrightonLAROSE PLMONASTERY RDDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonLEICESTER STWASHINGTON STDEAD ENDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED NEW EVERSOURCE ELECTIC AND NATIONAL GRID MAINS WILL DELAY PAVING UNTIL FALL 
Allston/BrightonLITCHFIELD STHOLTON STWESTERN AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED NEW EVERSOURCE ELECTIC AND NATIONAL GRID MAINS WILL DELAY PAVING UNTIL FALL 
Allston/BrightonMALBERT RDWASHINTON ST BRDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonMARKET STAT NORTH BEACONAT NORTH BEACON STEversource Electric ResurfacingAPRIL/MAY2 WEEKSNOT STARTED/ INTERSECTION ONLYNOT STARTED
Allston/BrightonMICHAEL RDRUSHMORE STDEAD ENDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED NEW EVERSOURCE ELECTIC AND NATIONAL GRID MAINS WILL DELAY PAVING UNTIL FALL 
Allston/BrightonMT VERNON ST BRACADEMY HILL RD FOSTER ST BRFull ReconstructionTO BE DETERMINED2 WEEKSNOT STARTED 
Allston/BrightonNORTH CRESCENT CIRCUITBRECK AVDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonPARSONS STFANEUIL STELECTRIC AVEversource Electric ResurfacingAPRIL/MAY2 WEEKSNOT STARTED 
Allston/BrightonQUINT AVBRIGHTON AV EB LANE (EVEN)GLENVILLE AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonRANSOM RDCLAYMOSS RDCOLBORNE RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonRENA STNORTH HARVARD STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED NEW EVERSOURCE ELECTIC AND NATIONAL GRID MAINS WILL DELAY PAVING UNTIL FALL 
Allston/BrightonRUGG RDCAMBRIDGE STBRAINTREE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED NEW EVERSOURCE ELECTIC AND NATIONAL GRID MAINS WILL DELAY PAVING UNTIL FALL 
Allston/BrightonRUSHMORE STACADEMY HILL RDMICHAEL RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonSNOW STWASHINGTON STUNION STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonST LUKES RDBRIGHTON AV EB LANE (EVEN)SERVICE RD (OFF COMM AV WB)Asphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonWILSHIRE RDCHESTNUT HILL AVDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonWM JACKSON AVCHESTNUT HILL AVDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Allston/BrightonWOODMONT STBROOKS ST BRDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Back BayARLINGTON STISABELA STMELROSE STFull ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
Back BayBEACON STARLINGTON STMASS AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BayBOYLSTON STEXETER STFAIRFIELD STSidewalk ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
Back BayCORTES STARLINGTON STBERKELEY STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BayEXETER STBOYLSTON STBLAGDEN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BayFAIRFIELD STMARLBOROUGH STCOMMONWEALTH AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BayMARGINAL STSHAWMUT AVARLINGTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BayMARLBOROUGH STARLINGTON STBERKELEY STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BayNEWBURY STDARTMOUTH STEXETER STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BayST JAMES AVARLINGTON STHUNTINGTON AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Back BaySTUART STWASHINGTON STCHURCH STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Beacon HillBEACON STTREMONT STPARK STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Beacon HillBEACON STPARK STARLINGTON ST BPAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Beacon HillBRANCH STSPRUCE STCLARLES STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Beacon HillRIVER STBEACON STCHESTNUT STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Beacon HillWALNUT STBEACON STMT VERNON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Boston ProperBATTERYMARCH STWATER STHIGH STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Boston ProperCANAL STNEW CHARDON STCAUSEWAY STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Boston ProperCOURT STAT COURT SQUARE@ COURT SQUARESidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED 
Boston ProperDEVONSHIRE ST@ OLD STATE HOUSE@ OLD STATE HOUSESidewalk ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED  
Boston ProperFEDERAL STMILK STHIGH STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Boston ProperFRANKLIN STHAWLEY STARCH STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Boston ProperFRIEND STMARKET STCAUSEWAY ST EB ODDFull ReconstructionTBDTBDNOT STARTED  
Boston ProperOLIVER STMILK STHIGH STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Boston ProperSTATE ST@ KILBY STAT KILBY STSidewalk ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED 
Boston ProperSUMMER STHAWLEY STKINGSTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED/ MAJOR UTILITY WORK IN SPRING/SUMMER/ PAVE IN FALL 
Boston ProperWINTHROP SQUAREAT OTIS ST @DEVONSHIRE STREETSAT OTIS @ DEVONSHIRE STREETSSidewalk ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED  
CharlestownALFORD STEVERETT TOWN LINEDEXTER STPrivate Development ResurfacingAPRIL2 MONTHSACTIVE/ PAVING BY ENCORE 
CharlestownCAMBRIDGE STSULLIVAN SQEXPRESS WAYY OFF RAMPPrivate Development ResurfacingAPRIL2 MONTHSACTIVE/ PAVING BY ENCORE 
CharlestownCARTER STCAMBRIDGE STROLAND STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
CharlestownCONCORD STMONUMENT SQBUNKER HILL STAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
CharlestownCROSS STHIGH STTRENTON STAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
CharlestownELLWOOD STPUTNAM STDEAD ENDAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
CharlestownHENLEY STHARVARD SQWARREN STAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
CharlestownHILL STDEAD ENDCOOK STAsphalt ResurfacingTBD2 WEEKSNOT STARTED  
CharlestownMONUMENT STMONUMENT SQBUNKER HILL STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
CharlestownNINTH STTHIRD AVFIRST AVAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
CharlestownPUTNAM STDEAD ENDCOMMON STAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
CharlestownSULLIVAN SQSULLIVAN SQSULLIVAN SQPrivate Development ResurfacingAPRIL2 MONTHSACTIVE/ PAVING BY ENCORE 
CharlestownTHIRD CTTHIRTEENTH STSIXTHTEENTH STAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
CharlestownTREMONT STPROSPECT STLOWNEY WAYAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
CharlestownWOOD STMAIN STHIGH STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
ChinatownBEACH STATLANTIC AVSURFACE ROADFull ReconstructionACTIVE6 MONTHSNOT STARTED 
DorchesterADAMS STMINOT STKENMARE RDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterBALINA PLNORFOLK STDEAD ENDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterBEAUMONT STCARRUTH STFAIRFAX STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterCARLOTTA STCENTRE STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterCLEMATIS STCENTRE STWHITTEN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterCRACUT STDORCHESTER AVBRUCE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterCUSHING AVMT CUSHING TERRACEUPHAM AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterDAVITT STSAVIN HILL AVEDEAD ENDAsphalt ResurfacingAPRIL2 WEEKSNOT STARTED 
DorchesterDAWSON STMONSIGNOR PATRICK LYDON WAYMALLET STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterDEWOLF STDOWNER AVHANCOCK STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterDIX STDORCHESTER AVADAMS STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterDORCHESTER AVAT LINDEN STAT LINDEN STSignal Installation WorkTO BE DETERMINED2 MONTHSNOT STARTED 
DorchesterDOVE STBLUE HILL AVDACIA STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterDROMEY STJUDSON STBROOKFORD STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterDUNBAR STWASHINGTON STWENTWORTH TERAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterEAST COTTAGE STCOLUMBIA RDPLEASANT ST Capital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterEAST COTTAGE STNORFOLK AVEDWARD EVERETT SQCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterEAST COTTAGE ST HUMPHREYS STNORFOLK AVSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
DorchesterEDWIN STDORCHESTER AVFLORIDA STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterELM LAWN STCLEMATIS STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterEPING STWASHINGTON STNORFOLK STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterERIE STELLINGTON STDRUMMOND STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterEUCLID STWASHINGTON STWITHINGTON STSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED/ON HOLD…CURRENTYCOORDINATING UTILITY WORK TO BE DONE BEFORE WE PAVE 
DorchesterEVERDEAN STFREEPORT STVICTORY RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterFAIRMOUNT STMILTON AVMORTON STAsphalt ResurfacingAPRIL2 WEEKSACTIVE 
DorchesterFLORIDA STLONSDALE STMON PATRICK J LYDON WAYCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterFRANCONIA STADAMS STCHARLEMONT STAsphalt ResurfacingAPRIL2 WEEKSCOMPLETED4/10/19
DorchesterGENEVA AVAT CHARLES AND WALDECK STREETSAT CHARLES AND WALDECK STREETSSignal Installation WorkTO BE DETERMINED2 MONTHSNOT STARTED 
DorchesterGINTA STCENTRE STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterGLENDALE STCOLUMBIA RDBIRD STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterGRANVILLE STGALLIVAN BLVDMILTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterGREENWOOD STHARLEM STHARVARD STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterHOPESTILL STASPINWALL RDSOUTHERN AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterHOWARD AVEDUDLEY STHARTFORD STAsphalt ResurfacingAPRIL2 WEEKSACTIVE 
DorchesterJOANNE TERADAMS STDEAD ENDAsphalt ResurfacingAPRIL2 WEEKSCOMPLETED4/9/19
DorchesterKANE STBELLEVUE STSTANLEY STAsphalt ResurfacingAPRIL2 WEEKSCOMPLETED4/12/19
DorchesterKENMARE RDMINOT STGALLIVAN BLVDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterMARLOWE STVINSON STPARK STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterMILLET STHARVARD STPARK STAsphalt ResurfacingAPRIL2 WEEKSACTIVE 
DorchesterMILLET STPARK STWHEATLAND AVAsphalt ResurfacingAPRIL2 WEEKSNOT STARTED 
DorchesterMON PATRICK J LYDON WAYFLORIDA STADAMS STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterNEW ENGLAND AVTALBOT AVWOODROW AVFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED  
DorchesterNORMANDY STSEAVER STCOLUMBIA RDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterOAKTON AVADAMS STPIERCE AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterODONNELL TERCENTRE STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterOLD MORTON STPLEASANT HILL AVSANFORD STAsphalt ResurfacingAPRIL2 WEEKSCOMPLETED4/9/19
DorchesterOLD RDMICHIGAN AVCOLUMBIA RDSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
DorchesterQUINCEFIELD STHUMPHREYS STWENDOVER STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
DorchesterQUINCY STBLUE HILL AV COLUMBIA RDFull ReconstructionMAY-APRIL10 MONTHSCOMPLETED4/23/19
DorchesterRIPLEY RDHARVARD STVASSAR STAsphalt ResurfacingAPRIL2 WEEKSACTIVE 
DorchesterSAVIN HILL AVDORCHESTER AVSAVIN HILL AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterSPENCER STPARK STWHEATLAND AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterSTANTON STNORFOLK STEVANS STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterTONAWANDA STWALDECK STGREENBRIER STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterTREADWAY RDSAVIN HILL AVDEAD ENDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterWHEATLAND AVMILLET STNORWELL STAsphalt ResurfacingAPRIL2 WEEKSNOT STARTED 
DorchesterWHITFIELD STSOUTHERN AVTHANE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterWHITTEN STDORCHESTER AVROZELLA STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterWILMINGTON AVGALLIVAN BLVDNEVADA STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterWOODCLIFF STHOWARD AVDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
DorchesterWOODLEDGE STCUNNINGHAM STDEAD ENDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonBAYSWATER STSARATOGA STST ANDREW RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonCHELSEA STMAVERICK STGEORGE R VISCONTI RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonGEORGE R VISCONTI RDCHELSEA STPARIS STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonGLADSTONE STWALLEY STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonLAMSON STEVERETT STMAVERICK STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonLEYDEN STBREED STWALLEY STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonMAVERICK STNEW STBORDER STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonMERIDIAN STLONDON STLONDON STSignal Installation WorkTO BE DETERMINED2 WEEKSNOT STARTED 
East BostonSARATOGA STTRIDENT STBURGER KING DRIVEWAYSidewalk ReconstructionTO BE DETERMINED2 WEEKSSIDEWALK RECON 
East BostonTRIDENT STSARATOGA STBENNINGTON STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED RECON/ADVERTISE IN FALL/ LIKELY START IN 2019 
FenwayBINNEY STFRANCIS STCHILDRENS RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
FenwayBROOKLINE AVLONGWOOD AVFENWAYAsphalt ResurfacingAPRIL2 WEEKSCOMPLETED4/7/19
FenwayBROOKLINE AVFENWAYBROOKLINE TOWN LINEAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkARLINGTON STHILTON STHYDE PARK AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkBUCKINHGHAM STREADVILLE STDEAD ENDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkCENTRAL AVARLINGTON STWESTMINSTER STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkCOLLINS STBADLEE STDEAD ENDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkEDSON STNORTON STCHESTERFIELD STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkERNEST STWEST MILTON STRIVER STAsphalt ResurfacingAPRIL2 WEEKSNOT STARTED 
Hyde ParkHALLRON STDEFOREST STGRASSMERE RDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkHUNTINGTON AVTHATCHER STRIVER STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Hyde ParkHYDE PARK AV AT DANA AVAT DANA AVSignal Installation WorkTO BE DETERMINED2 MONTHSNOT STARTED 
Hyde ParkHYDE PARK AVAT MILTON STAT MILTON STSignal Installation WorkTO BE DETERMINED3 MONTHSNOT STARTED 
Hyde ParkHYDE PARK AV MILTON STWOLCOT SQUARESidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED 
Hyde ParkLORING STWILLIAMS AVDANA AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkMAIDA TERRIVER STDEAD ENDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkMEADOWVIEW RDSTANBORO STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Hyde ParkMILTON STNEPONSET VALLEY PKWYSPRAUGUE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
Hyde ParkNEPONSET VALLEY PKWYAT WOLCOTT SQAT WOLCOTT SQSignal Installation WorkTO BE DETERMINED2 MONTHSNOT STARTED  
Hyde ParkNEWACRE RDGARFIELD AVWASHINGTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkNORTON STREADVILLE STRIVER STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkRESERVATION ROADHYDE PARK AVWINTER STSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
Hyde ParkROXANA STRIVER STSUNNYSIDE STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkSPRING HILL RDHIGHLAND STMILTON AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkSUMMIT STLOCHLAND RDMILTON AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Hyde ParkTHATCHER STHUNTINGTON AVMETROPOLITAN AVSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
Hyde ParkWINTER STGLENWOOD STRRESERVATION RDFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
Jamaica PlainBISHOP STNEWBERN STEVERETT STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainBYNNER STCREIGHTON STDAY STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainCASTLETON STSOUTH HUNTINGTON AVJAMAICAWAYCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainCENTRE STCOLUMBUS AVPERKINS STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainCENTRE STLAMARTINE STMORAINE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainDUNSTER RDCENTRE STJAMAICAWAYAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainELM STGREEN STEVERETT STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainGAY HEAD STCENTRE STROUNDHILL STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainHYDE PARK AVWASHINGTON STUKRAINE WAYAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainLAKEVILLE RDCENTRE STBEAUFORT RDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainMONTEBELLO RDBROOKSIDE AVWASHINGTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainMORAINE STBOYLSTON STJAMAICAWAYCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainNIRA AVDAY STGROTTO GLEN RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainPOND VIEW AVPERKINS STPERSHING RDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainROUNDHILL STWALDEN STDAY STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainWALDEN STHEATH STCENTRE STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainWASHINGTON STUKRAINE WAYBROOKWAY RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainWOOLSON STBLUE HILL AVNORFOLK STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Jamaica PlainZAMORA STPERKINS STCASTLETON STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanASTORIA STFLINT STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanBAIRD STBLUE HILL AVMORTON STCapital ResurfacingTO BE DETERMINED2 WEEKS NOT STARTED 
MattapanELIZABETH STNORFOLK STASTORIA STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanFABYAN STBLUE HILL AVHARVARD STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanFESSENDEN STBLUE HILL AVNORFOLK ST Capital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanFLINT STNORFOLK STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanFOTTLER RDWALK HILL STMATTAPAN STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanFRENCH STDELHI STVIOLET STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanLEDGEBROOK RDRIVER STMEADOWBANK AVFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
MattapanLEEHAVEN RDRIVER STMEADOWBANK AVFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
MattapanLIVINGSTONE STBLUE HILL AVLUCERNE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanLUCERNE STWOODROW AVMORTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
MattapanMEADOWBANK AVRIVER STDEAD ENDFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
MattapanNEWCROFT CIRCLERIVER STRIVER STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
MattapanOGDEN STWASHINGTON STDEAD ENDAsphalt ResurfacingAPRIL2 WEEKSNOT STARTED4/9/19
MattapanRIVER STAT EDGEWATER DRIVEAT EDGEWATER DRIVEIntersection Only WorkJUNE-JULY2 MONTHSNOT STARTED 
MattapanSOUTHMERE RDRIVER STLEDGEBROOK RDFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
MattapanWINSTON RDWILLOWWOOD STLUCERNE STAsphalt ResurfacingAPRIL2 WEEKSCOMPLETED4/12/19
Mission HillHARLESTON STCALUMET STPARKER HILL AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
Mission HillPARKER HILL AVHUNTINGTON AVPARKER STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndENDICOTT STTHACHER STNORTH WASHINGTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndHANOVER STCROSS STCOMMERCIAL STAsphalt ResurfacingSEPTEMBER2 WEEKSNOT STARTED/CURRENTLY ALLOWING UTILIY FIBER AND SERVICE CONNECTIONS TO BE DONE OVER THE SUMMER/ PAVING IN SEPTEMBER 
North EndHULL STSALEM STCOMMERCIAL STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndMOON STNORTH SQUARE LEWIS STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED  
North EndNORTH SQPRINCE STMOON STFull ReconstructionJUNE THROUGH NOVEMBER6 MONTHSACTIVE 
North EndPRINCE STPOND STPERKINS STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndSALEM STPRINCE STNORTH BENNET STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
North EndWIGET STSALEM STNORTH MARGIN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoslindaleBASILE STWASHINGTON STLINDALL STAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
RoslindaleBRADEEN STWASHINGTON STDEAD ENDAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
RoslindaleCANTERBURY STBOURNE STNEPONSET AVSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
RoslindaleKITTERDGE STAT WHITFORD STAT WHITFORD STSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
RoslindaleMETCALF STPENFIELD STDURNELL AVEAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoslindaleMEYER CTDEAD ENDMEYERS STAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
RoslindaleMEYER STDEAD ENDORGAN PARK STAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
RoslindaleSOUTH STAT BUSSEY STAT BUSSEY STSidewalk ReconstructionJULY- OCTOBER4 MONTHSNOT STARTED 
RoxburyBENTON STDOUGLASS, FREDERICK SQCOLUMBUS AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyBLANCHARD STBARTLETT STNORFOLK STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyCAMDEN STCOLUMBUS AVENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED  
RoxburyCOBDEN STWALNUT AVCARDINGTON STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyCOLEUS PKLAWRENCE AVINTERVALE STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyCRAWFORD STAT HOLLANDER STAT HOLLANDER STSidewalk ReconstructionAUGUST-SEPTEMBER1 MONTHNOT STARTED 
RoxburyDAVENPORT STTREMONT STCOLUMBUS AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyDECKARD STHUMBOLT AVWARREN STSidewalk ReconstructionAUGUST-SEPTEMBER1 MONTHNOT STARTED 
RoxburyDUBOIS STORCHARD PK STADAMS STAsphalt ResurfacingAPRIL2 WEEKSACTIVE 
RoxburyDUDLEY STMAGAZINE STWEST COTTAGEAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyDUDLEY STHARRISON AVMT PLEASANT AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyDUDLEY TEDUDLEY STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyDUNMORE STDUDLEY STMAGAZINE STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyEAST LENOX STHARRISON AVWASHINGTON STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED 
RoxburyELM HILL AVCRAWFORD STSEAVER STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyFAIRLAND STMT PLEASANT AVMONTROSE STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyFOREST STMT PLEASANT AVADAMS STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyGEORGE STMAGAZINE STSHIRLEY STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyHARRISHOF STWALNUT AVHUMBOLT AVSidewalk ReconstructionAUGUST-SEPTEMBER1 MONTHNOT STARTED 
RoxburyHARRISON AVMELNEA CASS BLVDEAST LENOX STSidewalk ReconstructionTO BE DETERMINED2 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
RoxburyHOMESTEAD STWALNUT AVELM HILL AVSidewalk ReconstructionAUGUST-SEPTEMBER1 MONTHNOT STARTED 
RoxburyHUMBOLT AVSEAVER STMALCOM X BLVDSidewalk ReconstructionAUGUST-SEPTEMBER1 MONTHNOT STARTED 
RoxburyJUMIPER STCEDAR STTHORNTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyJUNIPER TEJUNIPER STWASHINGTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyKEMBLE STGERARD STMAGAZINE STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyMALCOM X BLVDAT KING STAT KING STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED 
RoxburyMONTROSE STWARREN STMORELAND STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyMORELAND STWARREN STBLUE HILL AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyMT PLEASANT AVDEARBORN STBLUE HILL AVCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyNEWCOMB STHARRISON AVWASHINGTON STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
RoxburyRAYNOR CIRCLERUGGLES ST#40 RAYNOR CIRCLEFull ReconstructionSEPT -JUNE6 MONTHSACTIVE 
RoxburyREED STEAST LENOX STENDFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
RoxburyREGENT STCIRCUIT STDALE STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyRITCHIE STCOLUMBUS AVMARCELLA STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
RoxburyROCKVILLE PKWARREN STDEAD ENDCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyRUGGLES ST ESHAWMUT AVTREMONT STFull ReconstructionTBD4 MONTHSNOT STARTED 
RoxburySHAWMUT AVMELNEA CASS BLVDMADISON PARK CTSidewalk ReconstructionAUGUST -OCTOBER3 MONTHSNOT STARTED 1 SIDE 
RoxburySOJOURNER TRUTH CTKERR PLMELNEA CASS BLVDFull ReconstructionSEPT-JUNE6 MONTHSACTIVE 
RoxburyTHORNDIKE STHARRISON AVWASHINGTON STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
RoxburyTOWNSEND STWALNUT AVCRESTWOOD PKCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyTOWNSEND STHUMBOLDT AVWARREN STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyTUPELO STSAVIN STQUINCY STAsphalt ResurfacingAPRIL2 WEEKSCOMPLETED4/16/19
RoxburyVINE STDUDLEY STMT PLEASANT AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyWABON STWARREN STWABENOCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyWAKULLAH STROCKLAND STDALE STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyWALNUT AVHOLWORTHY STCOBDEN STSidewalk ReconstructionAUGUST-SEPTEMBER1 MONTHNOT STARTED 
RoxburyWARREN STDUDLEY STKEARSARGE AVFull ReconstructionAPRIL6 MONTHSNOT STARTED/ DUDLEY SQ 
RoxburyWEBBER STALBANY STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyWESTMINSTER AVWASHINGTON STWALNUT AVAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyWHITING STMORELAND STWINTHROP STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
RoxburyWINTHROP STWARREN STWINTHROP STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonATHENS STWEST SECOND STA STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonDRESSER STF STDORCHESTER STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonDRESSER STE STF STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonEAST FOURTH STK STL STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonEAST FOURTH STG STI STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonEAST SECOND STN STFARRAGUT RDAsphalt ResurfacingAPRIL2 WEEKSACTIVE 
South BostonEAST SECOND STH STK STAsphalt ResurfacingAUGUST-SEPTEMBER2 WEEKSNOT STARTED/ PAVING BY EVERSOURCE  
South BostonEAST SIXTH STL STP STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonEAST THIRD STN STFARRAGUT RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonEMERSON STEAST FOURTH STL STCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonFARRAGUT RDEAST FIRST STEAST SECOND STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonG STEAST BROADWAYDORCHESTER STAsphalt ResurfacingAPRIL2 WEEKSCOMPLETED4/11/19
South BostonH STCOLUMBIA RDEAST SECOND STAsphalt ResurfacingSEPTEMBER2 WEEKSNOT STARTED/ PAVING BY EVERSOURCE  
South BostonJAY STEAST FIFTH STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonK STEAST BROADWAYCOLUMBIA RDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonK STELKINS STEAST SECOND STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTEDEVERSOURCE/MCCOURT TO PAVE
South BostonN STEAST FIFTH STEAST EIGHTH STAsphalt ResurfacingAPRIL2 WEEKSNOT STARTED 
South BostonN STEAST SECOND STEAST BROADWAYAsphalt ResurfacingAPRIL2 WEEKSCOMPLETED4/11/19
South BostonSUMMER STEAST SEVENTH STEAST EIGHTH STSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
South BostonSUMMER STMELCHER STWEST SERVICE RDFull ReconstructionAPRIL- JULY4 MONTHSACTIVE  
South BostonWEST FOURTH STCROWLEY-ROGERS WAYDORCHESTER STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South BostonWEST SECOND STA STB STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
South EndBERKELEY STTREMONT STCOLUMBUS AVFull ReconstructionJUNE - NOVEMBER5 MONTHSACTIVE / WAITING FOR UTILITY WORK TO BE DONE BEFORE PAVING 
South EndDEACON STWORCESTER STWEST CONCORD STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South EndEAST BERKELEY STTREMONT STCOLUMBUS AVFull ReconstructionAUGUST 2016JULYRECONSTRUCTION/ACTIVE 
South EndHARRISON AVHERALD STEAST BERKELEY STSidewalk ReconstructionTO BE DETERMINEDTO BE DETERMINEDNOT START  
South EndMARGINAL RDSHAWMUT AVARLINGTON STAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South EndPAUL PLACESHAWMUT AVHERALD STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
South EndPAUL SULLIVAN WAYHARRISON AVALBANY STFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
South EndRUTLAND STSHAWMUT AVRUTLAND SQCapital ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
South EndWEST SPRINGFIELD STTREMONT STCOLUMBUS AVAsphalt ResurfacingTBDTBDNOT STARTED 
West RoxburyALLENWOOD STANAWAN AVPELTON STAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyAUTUMN STCENTRE STSUMMER STAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyBELLEVUE STBIRD PLBELLEVUE HILL RDAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyBELLEVUE STBIRD PLBELLEVUE HILL RDAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyCHAPIN STMT VERNON STPRESTON RDFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
West RoxburyEMMONSDALE RDLINNET STHOWITT RDCapital ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyFARMINGTON RDMANTHORNE RDWESTOVER STCapital ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyFLETCHER STCENTRE STMONTCLAIR AVCapital ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyGARNET RDWELD STFARMINGTON RDCapital ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyGERTRUDE RDPARK STWREN STAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyHAZELMERE RDKNOLL STDEAD ENDCapital ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyHAZELMERE RDKNOLL STDEAD ENDCapital ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyHOLLYWOOD RDCHURCH STWILLOWDEAN AVCapital ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyIVORY STDENT STTEMPLE STCapital ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyJACQUELINE RDANSONIA RDBIRCHLAND AVFull ReconstructionTO BE DETERMINED4 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
West RoxburyJESHURUN STGROVE STDEAD ENDAsphalt ResurfacingTO BE DETERMINED2 WEEKSNOT STARTED 
West RoxburyLAGRANGE STAT BELLEVUE HILL RDAT BELLEVUE HILL RDSidewalk ReconstructionTO BE DETERMINED3 MONTHSNOT STARTED YET. ADVERTISED LATE 2018/ LIKELY 2019 START 
West RoxburyMAPLE STGARTH RDMAPLE TRCapital ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyMONTCLAIR AVSUNSET HILL RDCOLBY RDCapital ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyPOMONA AVSANBORN AVCHESBROUGH RDCapital ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyPOTOMAC STVERMONT STDEAD ENDAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburyREDGATE RDEMMONSDALE RDLAGRANGE STCapital ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburySAVILLE STSTRATFORD STWOODARD RDAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburySTIMSON STWASHINGTON STDEAD ENDAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburySUNSET HILL PATHCENTRE STSUNSET HILL RDAsphalt ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
West RoxburySWAN STLAGRANGE STPHEASANT STCapital ResurfacingTO BE DETERMINEDTWO WEEKSNOT STARTED 
         
 