Off-Street Loading Guidelines
The Guidelines will ensure safe and efficient loading access, minimize adverse impacts on traffic-flow and pedestrian safety, and provide consistent guidelines for developers.
- Developer shall propose and obtain BTD approval for the design vehicle size.
- Developer shall submit a site plan with truck turning path plotted on a 1:20 scale site plan for the design vehicle approved by BTD (as required in Section 3 of the Transportation Access Plan Agreement). Plans shall be signed and stamped by a P.E.
- Developer is required to answer the questions in the attached PDF Off-Street Loading Guidelines.
