City of Boston
 
 
Boston Inspectional Services
Contact Us
 
City Departments
Obtaining a Building Permit
How Much does the Permit Cost?

Building Permit fees are based on the estimated cost of construction, including all labor and materials. It is important that the estimate be as accurate as possible. The Department will review these costs at the time of application, during construction, and before the occupancy permit is issued.

If there is a difference between the estimated cost and the actual cost, the builder or owner should, before applying for the Certificate of Occupancy, amend the application to increase the cost and pay the additional fee.

Should the department determine that the actual cost exceeds the estimate on the permit, and the applicant has made no effort to adjust the difference, the applicant will be required to pay a double fee prior to issuance of the Certificate of Occupancy based on the actual cost of construction.
Search:
News and Press Releases
Announcements
ISD Hours of Operation:
1010 Mass Ave.
Monday - Friday:

   8:00am - 4:00pm
Thursday Evening:
   8:00am - 7:00pm

Please note that the cashier closes 15 minutes prior to closing
Directions to ISD
Click here for directions to the Inspectional Services Department.
Related Links
Get Adobe Reader
Many forms are available in PDF format. To view and print in PDF format, you must download and install the reader.

Get Adobe Reader
 
Text Size: XX-Small Font Size X-Small Font Size Small Font Size

     
Privacy & Security Divider ©2008 The City of Boston