On February 3, 2005, the City of Boston, Department of Neighborhood Development (DND) received a petition from thirteen petitioners requesting that the Former Lewis Chemical Corporation disposal site be designated a Public Involvement Plan (PIP) site, pursuant to the Massachusetts Contingency Plan (MCP). On February 18, 2005, DND designated the Former Lewis Chemical Corporation disposal site a PIP site. DND and our environmental consultant, Environmental Strategies and Management, Inc. (ES&M), interviewed PIP petitioners, municipal officials and representatives of local organizations to initiate dialogue and identify community concerns in order to prepare a Draft Public Involvement Plan (Draft PIP). The purpose of the Public Involvement Plan is to ensure that the public is both informed of and involved in remedial response actions at the disposal site. The Draft PIP was formally presented to the public on Tuesday, April 5, 2005 at 6:30 PM at the Hyde Park Municipal Building.

In accordance with the Draft Public Involvement Plan, DND placed copies of the Draft PIP on this website as well as at a local repository at the Hyde Park branch of the Boston Public Library for public comment. In addition, DND placed the following other Draft MCP documents associated with the Lewis site on this website and at the local repository; the Phase I - Site Investigation Report Addendum, the Numerical Ranking System Scoresheet, the Tier I Permit Application, and the Phase II Comprehensive Site Assessment Scope of Work.

The public comment period for the Draft PIP and the other Draft MCP documents ended at 5 PM on April 25, 2005. The Final PIP Plan and MCP documents, public comments, and responses are provided below. Any questions regarding the Final PIP Plan or MCP documents should be forwarded to Thomas Barrasso, Department of Neighborhood Development, City of Boston, 26 Court Street, 9th Floor, Boston, MA 02108.

List of Draft MCP Documents for Public Comments:

NONE

-----------------------

List of Final MCP Documents:

Public Involvement Plan

Comments to Public Involvement Plan

Responses to Comments to Public Involvement Plan

Phase I - Site Investigation Report Addendum

Numerical Ranking System Scoresheet

Tier I Permit Application

Phase II Comprehensive Site Assessment Scope of Work

Release Abatement Measure Plan

Release Abatement Measure Completion Report

Release Abatement Measure Plan - Former Lewis Chemical Co. Site - Soil Vapor Extraction

Release Abatement Measure Status Report - Soil Vapor Extraction

Release Abatement Measure Status Report #2 - Soil Vapor Extraction  - November 2011

Release Abatement Measure Status Report #3 – Soil Vapor Extraction  - May 2012

Release Abatement Measure Status Report #4 - Soil Vapor Extraction - November 2012

Release Abatement Measure Completion Report – Soil Vapor Extraction- June 2013

Interim Final Phase II for Lewis Chemical

01 Draft PII report Text

02 Figures

03 Tables

04 Appendix A Test Pit and Boring Logs

05 Appendix B Slug Test Data

06 Appendix C Risk Assessment

07 Appendix D Lab-Soil Asbestos

08 Appendix E Lab-Groundwater

09 Appendix F Lab-Sediment Surface Water

10 Appendix G Lab-Soil Gas

-----------------------

Other Lewis Documents:

Lewis Chemical Presentation - January 2014

Phase I - Brownfields Site Assessment Report

Environmental Fact Sheet

Map of Fairmont PIP

Lewis Chemical - March 2010 Update

-----------------------



Search:
City Calendar
City Calendar See a listing of upcoming events sponsored by the Department of Neighborhood Development.
 
Text Size: XX-Small Font Size X-Small Font Size Small Font Size

     
Privacy & Security Divider © 2014 City of Boston. All rights reserved.