About / Technical Feasibility Study
For each of the streets investigated, the feasibility study produced plans, diagrams, and presentations outlining the following elements:
|
Urban Design Issues and Opportunities
Addressed elements of the individual street and its immediate surroundings that enhance or detract from creating a welcoming, informative, and engaging street environment. |
 |
 |
 |
Subsurface Conditions
Technical review of subsurface conditions that might impact the realm of options available to building above-ground, such as:
Central Artery Tunnel Project work
water and sewer lines
MBTA subway, bus tunnels
basement areaways
historic pavers
utility, cable lines
|
|
  (Click on map for larger pdf version) |
 |
Transportation Conditions
Detailed analysis of a variety of transportation elements along the Crossroads:
physical elements (roadway dimensions, crosswalks, unique features)
curb use
transit
identified issues (traffic/pedestrian volumes, security, etc.)
planned future changes
recommendations
|
|
  (Click on map for larger pdf version) |
 |
Pedestrian Realm
Provides the results of the “great streets” analysis for the individual Crossroads and a review of all ground floor uses.
|
|
  (Click on map for larger pdf version) |
 |
Integrated Future Vision
Though this task ultimately belongs to unique design teams, the Integrated Future Vision begins to put the various important pieces together. The deliverable is a draft plan outlining potential urban design interventions, subsurface conditions to review, transportation recommendations, and improvements for the pedestrian.
|
|
 |
 |
|
|
|